2004-08-10 00:00:00 | DENIED: |
| 1.PROVIDE ENERGY AND MANUAL J |
| CALCULATIONS IN ACCORCANCE WITH THE |
| 2001 FBC CHAPTER 13. |
| |
| 2.PROVIDE OUTSIDE AIR CALCUALTIONS |
| FOR THE APARTMENTS BY NATURAL MEANS PER |
| 2001 FBC(M) 402.2 & 402.2.1 OR 403.3. |
| |
| 3.PLAN SHEET M3.04, DETAIL INDICATES |
| 6" DRYER EXHAUST AND 6" TOILET EXHAUST. |
| DETAIL ALSO INDICATES A 6" & 4" IN |
| SOFFIT AND APPEARS TO TERMINATE INTO A |
| PLENUM BOX WITH A 12" X 8" WALL CAP. |
| |
| 4.PLEASE NOTE DRYER EXHAUST SHALL BE |
| NON-SCREENED WITH A BACKDRAFT DAMPER |
| AND THE TOILET EXHAUST TERMINATION SHALL |
| BE SCREENED. 2001 FBC(M) 504.4 & 401.6, |
| RESPECTIVELY. |
| |
| 5.PLEASE NOTE, EXHAUST DUCTS SHALL |
| TERMINATE AS NOT TO CREATE A NUISANCE OR |
| DIRECTED ONTO WALK-WAYS.2001 FBC(M) |
| 401.5.2. |
| |
| 6.OUTSIDE AIR INTAKE AND EXHAUST SHALL |
| BE LOCATED A MINIMUM OF 10 FT FROM LOT |
| LINES OR BUILDINGS ON THE SAME LOT. |
| INTAKE OPENINGS SHALL BE LOCATED A |
| MINIMUM OF 10 FT FROM ANY NOXIOUS |
| FUMES OR CONTAMINANT.2001 FBC(M) 401.5 |
| AND 401.5.1. |
| |
| 7.PLAN SHEET M8.01, DETAIL FOR |
| MOUNTING THE CONDENSOR UNIT.HEIGHT |
| FROM THE ROOF SURFACE TO THE BOTTOM OF |
| THE SUPPORT RAIL SHALL COMPLY WITH 2001 |
| FBC 1511.7 |
| |
| 8.PLEASE PROVIDE DETAIL FOR CONDENSATE |
| INDICATE TERMINATION.PROVIDE A MINIMUM |
| OF 12" AWAY FROM THE BUILDING STRUCTURE |
| AS PER 2001 FBC 1503.4.4. |
| |
| 9.SPECIFIC DRYERS INDICATED ON PLAN |
| SHEET M8.01 SHALL BE INSTALLED FOR |
| FINAL INSPECTION. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE |
| CONTACT PATTY KRAUSS AT (561) 805-6719. |