Date |
Text |
2004-03-29 00:00:00 | DENIED |
| REFERENCE: FBC-2001 PLUMBING |
| FBC-2001 FUEL GAS |
| FBC-2001 CHAPTER 1 |
| FLORIDA ADMINISTRATIVE CODE |
| FLORIDA STATUTES |
| |
| 1) SHT K-2 P-14, 3 SHOWN ON FLOOR PLAN, |
| BUT PLUMBING SCHEDULE QUANTITY SHOWS 2. |
| P-46 NOT FOUND ON FLOOR PLAN. |
| P-47, 2 SHOWN ON FLOOR PLAN IN THE |
| LOUNGE AREA, BUT SCHEDULE QUANTITY SHOWS |
| 1. PLEASE CLAIRFY. SECTION 104.2.1 |
| 2) SHT MP 303 SANT. RISER DOES NOT RE- |
| FLECT THE FLOOR PLAN. P-19 FIXTURES CON- |
| NECT DOWNSTREAM OF P-14 ON FLOOR PLAN, |
| BUT UPSTREAM OF P-14 ON RISER DIAGRAM. |
| PLEASE CLAIRFY. SECTION 104.2.1 |
| 3) SHT MP 303 WATER RISER DIAGRAM DOES |
| NOT REFLECT THE FLOOR PLAN. SEE PREVIOUS |
| COMMENT, AND P-5 WATER ON FLOOR PLAN |
| SHOWS P-5 UPSTREAM OF LAST FLOOR SINK, |
| BUT BETWEEN THE P-14'S ON RISER DIAGRAM. |
| PLEASE CLAIRFY. SECTION 104.2.1 |
| 4) GREASE INTECEPTOR REQUIRED SHALL BE |
| SIZED BY RODNEY COMPO, ENVIRONMENTAL |
| COMPLIANCE. WASTE ORD #2938-96. PHONE # |
| (561) 837-4074 |
| 5) THE FOLLOWING ARE REQUIREMENTS FOR |
| THE GAS PERMIT. SEPARATE GAS PERMIT REQD |
| A. SUBMIT AN ISOMETRIC DRAWING THAT |
| CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| AND CORRESPONDING LENGTHS PER FBC-2001 |
| FUEL GAS CODE. MAKE SURE GAS RISER IS IN |
| ISOMETRIC FORM. |
| B. SHOW TYPE OF PIPING MATERIAL BEING |
| INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| NUMBER OF CORRUGATED STAINLESS STEEL |
| TUBING FOR EACH PIPE SIZE IF USED). |
| C. TYPE OF GAS, (LP OR NATURAL) |
| D. BTU LOAD OF EACH APPLIANCE AND THE |
| TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| THE FBC-2001 FUEL GAS CODE SECS. 401.8 |
| THRU 402.5.2 AND TABLES 402(1) THRU |
| 402(34). - BTU'S NOT SHOWN FOR EXHAUST |
| AND MAKE UP AIR SYSTEM. |
| E. SHOW THE DISTANCE FROM THE POINT OF |
| DELIVERY, (METER), TO THE MOST REMOTE |
| OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| FBC-2001 FUEL GAS CODE APPENDIX A - USE |
| OF CAPACITY TABLES (A)(3). - MAKE SURE |
| TO GIVE THE DISTANCE TO THE MOST REMOTE |
| OUTLET IN THE BUILDING, NOT IN THE KIT- |
| CHEN. |
| F. INDICATE THE DELIVERY PRESSURE (PSI) |
| PER FBC-2001 FUEL GAS CODE SEC. 402.2. |
| NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| G. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| EQUIPMENT TO VERIFY COMPLIANCE WITH |
| STANDARDS NFPA 54, NFPA 58, AND THE |
| FBC-2001 FUEL GAS CODE SEC 402.2 |
| H. CLEARLY SHOW THE LOCATION AND CAP- |
| ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| OR ASME), THE DISTANCE OF THE TANK FROM |
| THE BUILDING AND ADJACENT PROPERTY LINES |
| THE DISTANCE OF THE TANK FROM ALL SOUR- |
| CES OF IGNITION, OTHER CONTAINERS, BUILD |
| INGS, AND THE LOCATION OF ANY BUILDING |
| OPENINGS BELOW THE RELIEF VALVE OF THE |
| TANK PER NFPA 58, TABLE 3-2.2.2. |
| I. CLEARLY INDICATE ON THE PLAN IF THE |
| LP TANK IS ABOVE OR BELOW GROUND, AND |
| SHOW REQUIRED PROTECTION OF THE TANK AND |
| APPURTENANCES PER NFPA 58. IF THE TANK |
| IS BELOW GROUND THE CONTAINER SHALL BE |
| SECURILY ANCHORED PER NFPA 58 SECTION |
| 3-2.2.7(H). |
| J. EMERGENCY HOOD SHUT DOWN SHUT OFF |
| VALVE TO BE BELOW CEILING. MANUAL SHUT |
| OFF VALVE TO BE UPSTREAM. UNION TO BE |
| DOWN STREAM OF MANUAL VALVE. SHOW ON ISO |
| METRIC. |
| 6) SHEETS K1, K2, & K,3 ARE NOT SIGNED |
| AND SEALED AS REQUIRED PER 61G1-16.001 |
| 7) SHEET MP 303 CERTIFICATE OF AUTHORIZ- |
| ATION REQUIRED PER 61G15-23.002(2) AND |
| FS 471.025 |
| |
| REVIEW BY KEN STEVENS |
| (561) 805-6721 |
| FAX (561) 653-2692 |
| E-MAIL [email protected] |