2004-02-11 00:00:00*************** UNSAT *************
  
 1)NOTE: PLEASE SEE 210.60A AND 210.52
 FOR RECEPT SPACING IN UNITS/ROOMS.
 THERE ARE MANY MISSING FOR 2' OF WALL
 SPACE AND W/IN 6' OF DOORWAYS.
  
 2)NOTE: PLEASE PROVIDE NOTE ON PLANS
 FOR REQUIRED BUSWAY/BUSDUCT CURBING PER
 368.8B(2)
  
 3)NOTE: PLEASE CLARIFY USEAGE. PERMIT
 APPLICATION AND PLANS CALL FOR A NEW
 5 STORY HOTEL. ELECTRICAL PLANS HAVE
 EACH INDIVIDUAL UNIT ON A SEPARATE
 ELECTRICAL METER FROM FPL. PLEASE
 PROVIDE INFORMATION FROM FPL AND OR HOW
 THIS FITS INTO BEING A HOTEL? IS BILLING
 FOR ALL METERS GOING TO ONE OWNER? ARE
 THESE "EXTENDED STAY" UNITS? ETC
 PLEASE PROVIDE FPL'S CONFORMATION OF
 THIS.
 THIS IS ALSO PROVIDING A POINT IN THE
 UDP TO RUN POWER TO OTHER LOCALS W/OUT
 BEING METERED FROM FPL.PLEASE VERIFY
 ALL OF THE ABOVE.
  
 4)NOTE: PLEASE PROVIDE ALL INFORMATION
 ON PLANS AND TITLE BLOCKS PER FAC
 61G1-16.004 FOR ARCH'S. THE ADDRESS
 IS REQ'D ON PLANS/ TITLE BLOCK.
 PLEASE ALSO SEE LICENSE INFORMATION FOR
 ARCH'S FIRM IS MISSING AS REQ'D PER
 ABOVE. PLEASE ALSO SEE FS 481.219 FOR
 REQ'D CERTIFICATE OF AUTHORIZATIONFOR
  
 5)NOTE: PLANS SHOW NEW POOL, HOWEVER
 POOL IS REQ'D TO BE UNDER A SEAPARATE
 PERMIT.
 PLEASE PROVIDE NOTE ON PLANS IN FOR
 TIMES OF PERMITTED SWIMMING. IF SWIMMING
 IS GOING TO BE AFTER DUSK. A PHOTOMETRIC
 STUDY WILL BE REQUIRED AND PLANS WILL
 ALSO REQ'D TO BE STAMPED BY THE PALM
 BEACH COUNTY HEALTH DEPT.
  
 6)NOTE:PLEASE SEE PANEL "HA", SHOW CIR-
 -CUIT FOR DRYER AT 5KW, HOWEVEROCP
 IS SHWON AT 2P-20A?
  
 7)NOTE: PLEASE SEE "DWELLING UNIT"
 DEFINITION IN NEC AND OTHER CODES.
 PLEASE SEE USAGE AND THE AMOUNT OF
 LAUNDRY FIXTURES REQ'D.
 PLEASE SEE PLUMB COMMENTS.
 THIS QUESTION WILL COINCIDE WITH NOTE
 #3 ABOVE.
  
 8)NOTE: PLEASE "UDP", SHOWN AS BEING MLO
 WITH TWO MAINS IN EQUIPMENT, HOWEVER
 "UDP" IS SHOWN AS HAVING 42 SPACES??
 PLEASE SEE THIS IS NOT PERMITTED DUE TO
 THE AMOUNT OF SPACES FOR A POSSIBLE
 ADDITION OF 33 MORE MAINS? (1P BRKRS).
 PLEASE SEE 230.71.A MCB MAY BE INSTALL
 -ED?
  
 9)NOTE: PLEASE SEE ALL PANEL SCHEDULES,
 FEEDERS/ RISER DIAGRAM IS MISSING
 EQUIPMENT GROUNDING CONDUCTORS PER
 250.110,250.24 ETC , SIZE PER 250.122
  
 10)NOTE: PLEASE PROVIDE COMPLETE FIXTURE
 SCHEDULE.
  
 11)NOTE: PLEASE SEE AREAS REQUIRED TO
 MEET 700.16.
 PLEASE ALSO SEE FIRE REVIEW COMMENTS
 FOR EM/EXT LTS REQUIRED. SEE EM/EXT FIX-
 -TURES SHOWN INDICATE HAVING AN EMERGEN-
 -CY BALLAST,HOWEVER NO INDICATION OF
 BATTERY BACK UP PER 700.12
  
 12)NOTE: PLEASE INDICATE/SHOW ALL HEIGHT
 -S FOR ALL ELECTRICAL DEVICES PER
 FHAR 24CFR 100.205. (FAIR HOUSING)
  
 13)NOTE: PLEASE PROVIDE ALL INFORMATION
 FOR FIRE PUMP. PLEASE ALSO PROVIDE
 INFORMATION ON RISER DIAGRAM FOR FIRE
 PUMP. PLEASE SEE 695.4B1
 PLEASE ALSO SEE 230.76, 230.79 FOR
 DISCONNECTING MEANS. PLEASE ALSO NOTE
 SIGNAGE FOR FIRE PUMP/LOCATION ETC IS
 REQ'D TO BE NOTED ONPLANS.(SIGNAGE)
  
 14)NOTE: PLEASE SEE RISER DIAGRAMS SHOWS
 FUTURE CONDUITS FOR RESTARUANT, YET
 ON THE RIGHT HAND SIDE OF E-7 , NOTE
 MENTIONS A 3P-400A MCB? PLEASE CLARIFY
 IF A MAIN IS GOING TO BE INSTALLED AT
 THIS TIME. IF SO, PLEASE PROVIDE INFOR-
 -MATION FOR DISC. IF NOT, PLEASE ADJUST.
  
 15)NOTE: PLEASE SEE GUTTER SIZE SHOWN,
 RISER APPEAR TO BE A MISPRINT FOR THE
 SIZE OF 12"X12"X6",, SHOULD BE 6'?
  
 16)NOTE: PLEASE SEE PANEL "HB", SHOWN
 AS 22.5 A'S. (MISPRINT)? 225A'S.
 "HB" HAS 200A OCP FEED.
  
 17)NOTE: PLEASE NOTE ON PLANS ALL
 ELECTRICAL WORK TO MEET 2002 NEC.
  
 18)NOTE: PLEASE SEE LOAD CALCULATIONS
 ON E-6, SHOWN AS 48 UNITS? PLEASE VERIFY
 THE OTHER 8 MISSING UNITS?
 215.5
  
 19)NOTE: PLEASE SEE 215.3,230.42 ETC,
 ALL CONTINUOUS LOADS ARE ALSO TO BE
 SHOWN AT 125%, NOT JUST THE LARGEST
 MOTOR LOAD.
  
 20)NOTE: PLEASE SEE THAT ELEVATOR MAINS
 ARE SHOWN AS ELEV 1,2 WHICH IS FINE.
 HOWEVER, THEY ARE ALSO MAINS 5,6?
 PLEASE ADJUST NOTES.
  
 21)NOTE: PLEASE SEE SD LOCATIONS TO
 MEETNFPA-72 8-1.4.1.6.2
 PLEASE SEE 8-1.4.2, SD'S REQUIRMENTS
 W/IN 20'OF COOKING APPLIANCES. PLEASE
 ALSO SEE 3' FROM BATH DOORS. PLEASE
 SEE WHICH TYPE ARE PERMITTED.
  
 PLEASE SEE ONE SET OF PLANS HAVE MOST
 ITEMS HIGHLIGHTED. PLEASE SEE, RAILING
 AREA OF SECOND FLOOR MEZZ UNITS ARE
 CONSIDERED WALL SPACE PER NEC, AND ARE
 REQ'D TO MEET 210.52 ALSO.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved