2004-01-12 00:00:00 | BUILDING REVIEW CHECKLIST: |
| 1-NEED RECORDED NOTICE OF COMMENCEMENT. |
| 2-STORM SHUTTERS: REVISE KEY PLAN AND |
| INSTALLATION SCHEUDLE TO MATCH PLANS. |
| NEED EMERGENCY EGRESS THAT COMPLIES |
| WITH SEC. 1005.4.5 FBC 2001. |
| B)CLEARLY INDICATE ANCHOR TYPE & SPACING |
| TO BE USED ACCORDING TO EDGE DISTANCE |
| PANEL SPAN, CONNECTION TYPE, DESIGN |
| PRESSURES & STRUCTURE TO BE ATTACHED |
| TO (MASONRY OR CONCRETE). |
| 3-PROVIDE FLORIDA PRODUCT APPROVAL FOR: |
| A)HORIZONTAL SLIDER WINDOW. NEED THE |
| APPROVED DRAWINGS. |
| B)GLASS BLOCK. |
| C)ROOF TILE (FBC APPROVAL IS PENDING). |
| D)SINGLE HUNG WINDOWS. |
| E)ENTRY DOOR WITH SIDELITE ASSEMBLY. |
| F)SLIDING GLASS DOORS. |
| G)WINDOW MULLIONS. |
| H)TRUSS CONNECTORS. |
| |
| 4-ARCHITECT TO HAVE ALL HIS INFORMATION |
| ON TITLE BLOCK AND SIGN AND DATE DWGS |
| AS REQ'D BY CHAPTER 481 FL STATUTES. |
| SEE 61G1-16004 F.A.C. |
| 5- 1HR FIRE RATED GLASS BLOCK ASSEMBLY |
| NEED SPECIFIC UL LISTED ASSEMBLY AND |
| REVISE DETAIL TO SHOW ALL COMPONENTS |
| SPECIFIED ON THE UL ASSEMBLY. SECTION |
| 104.2.1.2 CITY AMENDMENTS TO FBC 2001. |
| 6-CLARIFY GARAGE DOOR BUCK SPECS.DETAIL |
| E/4 AND NOTES ON DWG #2 DON'T MATCH. |
| CHECK SIZE OF FASTENER TO ALLOW 2" |
| EMBEDMENT. SEC. 104.2.1.2 CITY |
| AMENDMENTS TO FBC 2001. |
| 7-REVISE/UPDATE TRUSS ANCHOR SCHEDULE & |
| ALL DETAILS THAT ARE AFFECTED BY SEC. |
| 1609.4.3 FBC 2001. |
| B)PROVIDE SPECIFIC SIZE OF USP RT |
| CONNECTOR TO BE USED. SEC. 104.2.1.2 |
| CITY AMENDMENTS TO FBC 2001. |
| 8-ENGINEER TO SPECIFY ROOF TILE FASTENER |
| AS REQ'D BY SEC. 104.2.1.1 OF CITY |
| AMENDMENTS TO FBC 2001 |
| 9-REVISE WINDOW BUCK DETAIL. SEE SECTION |
| 1707.4.4.2 FBC 2001 FOR PROPER BUCK |
| INSTALLATION. |
| 10-SHEET #7: A)CLARIFY WHERE IS USP |
| EHUH 28-3 TAKEN FROM? UNABLE TO FIND |
| IN 2003 CATALOGUE. SEC. 104.2.1.2 CITY |
| AMENDMENTS TO FBC 2001. |
| B)MISSING SPECS FOR CONNECTOR AT ONE END |
| OF GIRDER TRUSS AT REAR PORCH. SECTION |
| 104.2.1.2 CITY AMENDMENTS TO FBC 2001. |
| C)REAR ELEVATION: CLARIFY CALCULATED |
| PRESSURES FOR OPENINGS. WHY SAME |
| PRESSURES FOR DIFFERENT OPENING SIZE |
| AND LOCATION. SEC. 104.2.1.2 CITY |
| AMENDMENTS TO FBC 2001. |
| **CLEARLY INDICATE TYPE OF WINDOW. DWG |
| SHOW FIXED WINDOWS WHICH DOESN'T MATCH |
| WINDOW SCHEDULE. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| JULIO GOMEZ AT 805-6712. |