Date |
Text |
2004-02-23 00:00:00 | DENIED |
| REFERENCE: FBC-2001 PLUMBING |
| FBC-2001 CHAPTER 11 |
| |
| A) COMMENTS FROM PREVIOUS REVIEW HAVE |
| NOT BEEN ADDRESSED SUFFICIENTLY. COMMENT |
| NUMBERS SHALL REMAIN THE SAME FOR CLAIR- |
| ITY. |
| 3) SHT A3 (CHANGED FROM A2) FLOOOR PLAN |
| URINAL SHALL BE ACCESSIBLE PER SECTION |
| 11-4.22.5. PROVIDE A DETAIL SHOWING |
| COMPLIANCE WITH SECTION 11-4.18 AND ALL |
| SUBSECTIONS. |
| 4) PROVIDE A ROOF PLAN. SHOW PRIMARY AND |
| SECONDARY ROOF DRAINS AND THEIR LOCATION |
| AND SHOW SIZE OF DRAINS AND PIPE SIZES. |
| 5) SUBMIT CALCULATIONS FOR PRIMARY AND |
| SECONDARY ROOF DRAINS PER SECTIONS 1106 |
| & 1107 AND ALL SUBSECTIONS. SHOW 1/2 |
| AREA OF ALL VERTICAL WALLS INCLUDING |
| PARAPETS ADDED TO CLACULATIONS. SHOW |
| AREAS OF ROOFS THAT DRAIN ONTO ROOF FROM |
| ABOVE ADDED TO CALCULATIONS. |
| ----------NO DETAIL WAS SUBMITTED FOR |
| THE URNAL---------NO CALCULATIONS SHOW- |
| ING 1/2 AREA OF VERTICAL WALLS ADDED TO |
| SQUARE FOOTAGE OF ROOF. NO AREA OF UPPER |
| ROOF WAS SHOWN BEING ADDED TO CALCULAT- |
| IONS. NO PRIMARY ROOF DRAINS ARE SHOWN. |
| ONLY SCUPPER DRAINS WERE SHOWN. (SECOND- |
| ARY DRAINS) - NO NEW SECTION OF ROOF IS |
| SHOWN BEING ADDED TO EXISTING ROOF.----- |
| NEW COMMENT******** |
| 1B) SUBMIT A DETAIL SHOWING ALL SECOND- |
| ARY SCUPPERS SHOWING HEIGHT & WIDTH AND |
| SHOW HEIGHT OF FLOW LINE OFF ROOF AS RE- |
| QUIRED IN SECTION 1503.4.2 OF THE FBC |
| BUILDING. |
| 2B) REFERENCED ON SHEET A10 IS TABLE |
| 1106.3 FOR HORIZONTAL PIPING. NO PIPING |
| IS SHOWN. SUBMIT A STORM RISER DIAGRAM. |
| 3B) REFERENCED ON SHEET A10 IS TABLE |
| 1106.6 INDICATING THAT GUTTERS ARE BEING |
| USED. NO GUTTERS ARE SHOWN. PLEASE |
| CLAIRFY. |
| 4B) A CERTIFICATE OF AUTHORIZATION IS |
| REQUIRED PER FS 481.219 |
| *******NEW COMMENTS |
| 5B) UPON CONVERSING WITH BLDG PLAN RE- |
| VIEWER, I SEE THAT THERE ARE MODIFICAT- |
| IONS TO THE OTHER BLDG. (SOUND ADVISE) |
| THIS WILL REQUIRE CALCULATIONS FOR THE |
| EXISTING ROOF OF THAT BLDG. SHOWING THE |
| SQUARE FOOTAGE OF THE ROOF AND SHOWING |
| 1/2 AREA OF ALL VERTICAL WALLS INCLUDING |
| PARAPETS. A ROOF PLAN WILL BE REQUIRED |
| SHOWING PRIMARY AND SECONDARY ROOF |
| DRAINS AND THERE LOCATION. SHOW SIZES OF |
| ROOF DRAINS, PIPING SIZES, GUTTERS, |
| RAIN WATER LEADERS, DOWNSPOUTS ECT. |
| SECTIONS 1106 & 1107 AND ALL SUBSECTIONS |
| 6B) MSDS SHEETS FOR ALL HAZADOUS MATER- |
| IALS. REVIEW OF THESE SHEETS MAY CAUSE |
| MORE COMMENTS TO BE FORTHCOMMING. ALSO |
| AN EYEWASH AND/OR EMERGENCY SHOWER MAY |
| BE REQUIRED. |
| |
| REVIEW BY KEN STEVENS |
| (561) 805-6721 |
| FAX (561) 653-2692 |
| E-MAIL [email protected] |