Plan Review Notes For Permit 03110633 |
Permit Number |
03110633 |
|
Review Stop |
ENG |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2003-12-05 00:00:00 | FAILED: | | 1. PLEASE PROVIDE STORM WATER | | CALCULATION FOR OUR REVIEW, INCLUDE | | PERVIOUS AND IMPERVIOUS AREA FOR TOTAL | | SITE. | | 2. DCDA MUST BE INSTALLED ON PROPERTY | | AT BACK OF THE SIDEWALK. | | 3. A CLEAN-OUT MUST BE INSTALLED IN | | SEWER LATERAL ON PROPERTY, BACK OF THE | | SIDEWALK. | | 4. PLEASE SUBMIT CIVIL PLANS ONLY TO THE | | PUBLIC UTILITIES AND ENGINEERING FOR | | ALL THE CONNECTIONS TO CITY SERVICES AND | | THEIR REQUIREMENTS. | | 5. PLEASE CONTACT RODNEY COMPO FOR | | INSTALLATION OF GREASE/WATER SEPARATOR, | | SIZE, LOCATION.TWO DETAILS SHOWN,SHEET | | C-4.2. 837-4051 EX. 4074 | | 6. ALL PARKING STALLS MUST BE PAINTED | | WITH DOUBLE 4" WIDE STRIPES, PLEASE | | REVISE DETAILS, SHEET C-4.3 | | 7. DUMPSTER INCLOSURE MUST BE SIZED AT | | MIN. 12'-6" OPENING BETWEEN THE POSTS | | AND 12'-0" DEEP. | | 8. PULLOTION PREVENTION PLANS MUST BE | | INCLUDED IN CIVIL PLAN AND MUST BE | | INSTALLED IN THE FEILD PRIOR TO ANY | | EARTH/CONSTRUCTION WORK BEGINS. | | | | IF ANY QUESTION PLEASE CONTACT 805-6723 | | MOHAMMAD R. AMINI |
|