2003-12-10 00:00:00DENIED
  
 1) SUBMIT THE SUBSURFACE SOIL REPORT FOR
 THE PROJECT SIGNED AND SEALED BY THE
 SOIL ENGINEER, SEE FBC 1804.2.2 AS
 AMENDED BY THE CITY OF WPB.
  
 2) PLANS WERE SUBMITTED FOR BOTH A RIGHT
 AND LEFT MODEL. SUBMIT ENERGY CALCS. FOR
 BOTH MODELS.
  
 3) PLEASE REVISE THE GLASS BLOCK
 INSTALLATION DETAIL ON SHEET 2 TO
 COMPLY WITH MANUFACTURER'S INSTALLATION
 FOR ONE HOUR FIRE RATED GLASS BLOCK.
  
 4) THE DIMENSIONS FOR THE FIXED GLASS
 TRANSOM ABOVE THE FRONT DOOR ARE
 REVERSED. PLEASE CORRECT.
  
 5) REVISE THE FASTENING NOTE FOR THE
 HIGH RIB METAL LATH ON THE CEILING AT
 THE REAR PORCH SECTION ON SHEET 4. THE
 FASTENERS ARE REQUIRED TO PENETRATE THE
 FRAMING A MINIMUM OF 1-3/4", THEREFORE,
 A 2" NAIL WOULD BE REQUIRED. SEE ASTM C
 1063.
  
 6) THE PRODUCT APPROVALS FOR THE
 BENCHMARK DOOR IS PENDING STATE APPROVAL
 A LOCAL PRODUCT APPROVAL FORM FROM THE
 CITY OF WPB IS REQUIRED ALONG WITH THE
 METRO-DADE NOA.
  
 7) THE GLASS BLOCK WILL REQUIRE CITY
 PRODUCT APPROVAL FORM WITH A MIAMI-DADE
 NOA.
  
 8) WRONG STATE PRODUCT APPROVAL COVER
 SHEET WAS SUBMITTED FOR THE ALL AMERICAN
 SHUTTERS.
  
 9) SUBMIT THE APPROPRIATE STATE COVER
 SHEETS LISTING THE SPECIFIC WINDOW AND
 DOOR MODELS THAT WILL BE INSTALLED IN
 THE STRUCTURE. PROVIDE THE APPROPRIATE
 INSTALLATION INFORMATION, LIMITATIONS,
 TEST INFORMATION AS REQUIRED BY RULE 9B-
 72.
  
 10) SUBMIT THE APPROPRIATE CITY FORM
 AND THE INFORMATION REQUIRED FOR
 EVALUATION REPORT SUBMITTALS FOR LOCAL
 PRODUCT APPROVAL,PER RULE 9B-72.040(5)
 FOR THE COLLIER GARAGE DOORS.
  
 11) TRUSSES: THE WRONG CODE INFORMATION
 IS LISTED ON THE TRUSS DRAWINGS. CHANGE
 SBC TO FBC. PROVIDE TRUSS LAYOUTS FOR
 BOTH THE RIGHT AND LEFT MODELS. THE
 TRUSS LAYOUT IS TO BE SIGNED AND SEALED
 BY THE TRUSS ENGINEER AND REVIEWED AND
 APPROVED BY THE DESIGNER OF RECORD AND
 SO NOTED ON THE DRAWINGS. THE BOTTOM
 CORD LIVE LOAD IS LISTED ON THE TRUSS
 DRAWINGS AND LAYOUT AS 0. THE FBC
 REQUIRES A 10 PSF BOTTOM CORD LIVE LOAD
 FOR ATTICS WITHOUT STORAGE. SEE FBC
 TABLE 1604.1.
  
 12) THE UPLIFTS FOR TRUSSES GRE-DH AND
 GRC EXCEED THE UPLIFTS OF THE SPECIFIED
 TRUSS CONNECTORS. PLEASE REVISE. THE
 CENTER POINT BEARING UPLIFT IS 3587# FOR
 GRE-DH AND 1202# AT BEARING PT. 10 OF
 GRC.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW