Plan Review Notes
Plan Review Notes For Permit 03081726
Permit Number 03081726
Review Stop P
Sequence Number 1
Notes
Date Text
2003-09-25 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 1
 FBC-2001 CHAPTER 11
 FLORIDA ADMINISTRATIVE CODE
 W.P.B. CITY CODE
  
 1) SHT A.5.3 DETAIL 7, SINK SHALL COMPLY
 WITH 11-4.24 AND ALL SUBSECTIONS. PROVI-
 DE DETAILS, SHOW CLEAR FLOOR SPACE,
 HEIGHT & CLEARANCES, FAUCETS, PIPES AND
 SURFACES, ECT.
 2) CERTIFICATE OF AUTHORIZATION REQUIRED
 ON EACH SHEET. SEE ATTACHED SHEET.
 61G15-23.002(2) - ALSO ENGINEER SHALL
 LEGIBLY INDICATE THEIR NAME AND LICENSE
 NUMBER ON EACH SHEET.
 2) A RPZ BACKFLOW IS REQUIRED. 608.13.2.
 3) SUBMIT CALCULATIONS FOR PRIMARY AND
 SECONDARY ROOF DRAINS PER SECTIONS 1106
 & 1107 AND ALL SUBSECTIONS. (NEW ROOFS &
 PARAPETS) SHOW 1/2 AREA OF ALL VERTICAL
 WALLS AND ALL AREAS OF ROOFS THAT DRAIN
 ONTO THE ROOF FROM ABOVE ADDED TO CALCU-
 LATIONS. PROVIDE A ROOF PLAN TO SHOW
 LOCATIONS OF PRIMARY & SECONDARY ROOF
 DRAINS. SHOW SIZE OF DRAINS, AND IF
 SCUPPERS ARE USED PROVIDE A DETAIL SHOW-
 ING WIDTH AND HEIGHT OF OPENING ECT. PER
 SECTION 1511.6.4.3 AND SECTION 1107.
 4) DRESSING ROOM BENCH TO BE FIXED TO
 THE WALL ALONG THE LONGER DIMENSION, 17"
 TO 19" ABOVE FINISHED FLOOR. SECTION
 11-4.35.4
 5) THE FOLLOWING INFORMATION REQUIRED
 FOR GAS PERMIT. SEPARAGE GAS PERMIT REQ-
 UIRED.
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2001
 FUEL GAS CODE.
 B. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
 FBC-2001 FUEL GAS 402.3
 C. TYPE OF GAS, (LP OR NATURAL)
 D. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2001 FUEL GAS CODE SECS. 401.8
 THRU 402.5.2 AND TABLES 402(1) THRU
 402(34).
 E. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2001 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
 F. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2001 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES (A)(3).
 G. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2001 FUEL GAS CODE SEC 402.2
 H. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
 J. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND
 APPURTENANCES PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
 6) GREASE INTERCEPTOR THAT IS BEING
 ABANDONED SHALL BE CLEANED OUT, AND RE-
 MOVED ENTIRELY, OR CLEANED OUT, THE TOP
 REMOVED, THE BOTTOM BUSTED UP AND FILLED
 WITH CLEAN FILL. BOTH LINES INTO AND OUT
 OF THE GREASE INTERCEPTOR SHALL BE CAPP-
 ED AND INSPECTED PRIOR TO COVERING.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]


Account Summary | Usage Policy | Privacy Policy