Date |
Text |
2003-09-02 00:00:00 | DENIED |
| |
| 1) IMPACT FEES MUST BE PAID TO PALM |
| BEACH COUNTY, PLANS STAMPED BY THEM AND |
| COPY OF RECEIPT SUBMITTED TO CITY OF |
| WEST PALM BEACH BUILDING DEPARTMENT, |
| BEFORE A BUILDING PERMIT CAN BE ISSUED. |
| |
| 2) A RECORDED COPY OF THE NOTICE OF |
| COMMENCEMENT MUST BE SUBMITTED BEFORE A |
| PERMIT CAN BE ISSUED. |
| |
| 3) THE SURVEY IS THE REVERSE OF THE |
| ARCHITECTURAL PLANS. PLEASE CORRECT. |
| |
| 4) THE DOOR TO THE TOILET IN THE MASTER |
| BATH DOES NOT COMPLY WITH THE 29" CLEAR |
| OPENING REQUIRED BY FBC 11-4.22.2. |
| |
| 5) THE DIMENSIONS FOR THE STAIR RISERS |
| AND TREADS ON A-2 DOES NOT CORRESPOND |
| WITH DETAILS 12 AND 13 ON A-8. THE |
| INTERMEDIATE RAILS ON THE STAIRS ARE |
| REQUIRED TO REJECT A 4" SPHERE PER FBC |
| 1015.3. |
| |
| 6) REVISE DETAIL 4 ON A-8. STUCCO ON |
| VERTICAL METAL BASE IS REQUIRED TO BE |
| 7/8" THICK PER FBC 2504.2.1 AND ASTM C |
| 926. |
| |
| 7) THE TWO STORY WALL SECTION ON A-6 |
| SPECIFIES AN 18" WIDE FOOTING AND THE |
| FOOTING SCHEDULE ON A-1 REQUIRES A 20" |
| WIDE FOOTING. PLEASE CORRECT. |
| |
| 8) THE COLUMN IS NOT SPECIFIED AT THE |
| F10 PAD ON SHEET A1. |
| |
| 9) REVISE THE BUCK DETAIL ON A-8. THE |
| FRAMES ARE REQUIRED TO BE FASTENED |
| THROUGH THE 1X BUCKS INTO THE SUBSTRATE |
| PER FBC 1707.4.4.2. |
| |
| 10) SUBMIT AN INSTALLATION SCHEDULE AND |
| KEY PLAN FOR THE STORM PANELS. |
| |
| 11) REVISE THE STUCCO NOTES ON SECTION |
| A-A ON A-6. HIGH RIB METAL LATH IS |
| REQUIRED TO BE FASTENED AT EVERY RIB |
| (4"O.C.) PER ASTM C 1063. SEE FBC |
| 2504.2.2. |
| |
| ROBERT MCDOUGAL |
| BLDG. PLAN REVIEW |
| (561)805-6714 |