2003-08-14 00:00:00 | *****CORRECTIONS****** |
| |
| SAMANTHA THYNG, BUILDING PLANS EXAMINER |
| [email protected] |
| |
| 1.)ADDITIONAL PERMITS REQUIRED. |
| |
| 2.)A NOTICE OF COMMENCEMENT MUST BE |
| FILED WITH THE CLERK OF COURTS BEFORE A |
| PERMIT CAN BE ISSUED. |
| |
| 3.)ENERGY CALCS REQUIRED, FBC13-103.1. |
| 2.WHEN RESUBMITTING, SIGN THE OWNER/ |
| AGENT LINE OF THE ENERGY CALC. |
| |
| 4.)FEES DUE ($2.16, RADON) |
| |
| 5.)IMPACT FEES MUST BE PAID TO PALM |
| BEACH COUNTY.THE PLANS MUST BE |
| STAMPED AND THE RECEIPT ATTACHED TO THE |
| PERMIT APPLICATION. |
| |
| 6.)IMPROVEMENTS OF OVER 50% MUST |
| COMPLY WITH FBC3401.7.2.6. |
| |
| 7.)THIS PROPERTY IS IN A FLOOD ZONE |
| AND MUST COMPLY WITH CITY OF WEST PALM |
| BEACH MUNICIPAL CODE 94-546(B)(1). |
| PROVIDE A SURVEY AND FLOOD ELEVATION |
| CERTIFICATE FOR THIS PROPERTY.SHOW |
| THE PROPOSED ELEVATION FOR THE ADDITION. |
| |
| 8.)ROOF FRAMING PLAN REFERS TO |
| ATTACHMENT 2, NOT ON THE CONNECTION |
| SCHEDULE. |
| |
| 9.)ALL WINDOWS ARE SHOWN AS FIXED |
| IMPACT GLASS ON THE SCHEDULE (A1). |
| ALL BEDROOMS ARE REQUIRED TO HAVE |
| EMERGENCY EGRESS, FBC1005.4. |
| |
| 10.) A-43, CONTINUOUS GABLE ENDWALL |
| REINFORCEMENT, REFERS TO 110 MPH.CITY |
| OF WPB IS 140MPH 3 SECOND GUST. |
| |
| 11.) PLYWOOD SHEATHING NAILING SCHEDULE |
| (A3) COMPLIES WITH THE CITY OF WPB |
| AMENDMENTS TO THE FBC, TABLE 2306.1, |
| BUT THE WALL SECTION DOES NOT (A-A3). |
| |
| 12.) BOTTOM OF FOOTING MUST BE MINIMUM |
| OF 12" BELOW GRADE, FBC1804.1.3.SHOW |
| ON WALL SECTION. |
| |
| 13.)FLOOR ELEVATION IS REQUIRED TO BE |
| A MINIMUM OF 4" ABOVE FINISH GRADE, |
| CITY OF WPB AMENDMENTS TO THE FBC |
| 1804.1.7.REVISE WALL SECTION. |
| |
| 14.) A1, FLOOR PLAN REMODEL, AT THE |
| NEW WIC, SHOWS DETAIL 1-A4.NOT ON |
| PLAN. |
| |
| 15.)FIRESTOP REQUIRED, FBC705.3. |
| |
| 16.)SUBMIT TWO LEGIBLE COPIES OF |
| PRODUCT APPROVALS: |
| GARAGE DOOR |
| BAHAMA SHUTTES |
| WINDOWS |
| MULLIONS |
| ROOF TILE (MAY BE SUBMITTED W/ROOF |
| PERMIT APPLICATION) |
| |
| 17.)PROVIDE A SOILS INVESTIGATION |
| REPORT. |