Plan Review Notes
Plan Review Notes For Permit 03071439
Permit Number 03071439
Review Stop P
Sequence Number 1
Notes
Date Text
2003-08-18 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 CHAPTER 11
 FHA-98 DESIGN MANUAL
  
 1) SHTS A05/07/09 SUBMIT CALCULATIOS FOR
 PRIMARY AND SECONDARY ROOF DRAINS. SHOW
 SQUARE FOOTAGE OF ROOF & SHOW 1/2 AREA
 OF VERTICAL WALLS (PARAPETS) IN CALCUL-
 ATIONS. SHOW SIZE OF ALL DOWNSPOUTS.
 SHOW LOCATIONS FOR ALL SECONDARY ROOF
 DRAINS (SCUPPERS) - PROVIDE A DETAIL FOR
 ALL DRAINS. SHOW HEIGHT & WIDTH.
 2) SHT P01 OF 29 - S/4 & S/5, SHOW ALL
 PIPE SIZES ON ISOMETRIC DIAGRAMS. STAND-
 PIPE REQUIRED FOR WASH MACHINE. SECTION
 802.4. - CLEANOUTS REQUIRED 4' ABOVE
 FLOOR AT WASH MACHINE. SECTION 708.10
 3) SHT P01 OF 29 FLOOR PLAN FOR A101/S3
 SECOND FLOOR STACK NOT SHOWN.
 4) SHT P01 OF 29 FLOOR PLAN FOR A102/S4
 SHOWS PIPE RUNNING WEST OF SHOWER AT 2"
 THEN 1-1/2" AND TERMINATES IN LAUNDRY
 ROOM BY UNIT A103. PLEASE CLAIRFY. ALSO
 FLOOR PLAN DOES NOT SHOW WHERE IT TIES
 INTO SEWER.
 5) SHT P02 BY 29 ISOMETRIC RISER S/3
 2ND FLOOR BATHROOM SHALL TIE IN DOWN-
 STREAM OF 1ST FLOOR W/C.
 6) SHT P02 OF 29 ISOMETRIC RISER DOES
 NOT REFLECT FLOOR PLAN. SEE COMMENT #4.
 7) GAS PERMIT APPLICATION REQUIREMENTS.
 SEPARATE GAS PERMIT REQUIRED.
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2001
 FUEL GAS CODE.
 B. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
 (GAS NOTES STATES POLYETHYLENE PIPE TO
 BE USED ABOVE GROUND. NOT APPROVED PER
 SECTION 403.3. DELETE REFERENCE).
 C. TYPE OF GAS, (LP OR NATURAL)
 D. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2001 FUEL GAS CODE SECS. 401.8
 THRU 402.5.2 AND TABLES 402(1) THRU
 402(34).
 E. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2001 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES (A)(3).
 F. SUBMIT CALCULATIONS FOR COMBUSTION
 AIR (IF APPLICABLE) PER FBC-2001 FUEL
 GAS CODE SECTION 304.
 G. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2001 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
 H. SUBMIT A DETAIL SHOWING THE TYPE,
 LOCATION, SIZE AND TERMINATION OF THE
 GAS VENTS PER FBC-2001 FUEL GAS CODE
 SECS. 502 THRU 506.
 (IF LP GAS FOLLOWING INFO REQUIRED)
 I. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
 J. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND
 APPURTENANCES PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
 8) SHT P02 OF 29 PLUMBING NOTES #8,
 TABLE 704.1 - PIPE SIZE 2-1/2" OR LESS
 SHALL BE RUN AT 1/4" PER FOOT SLOPE MIN.
 9) SHT P02 OF 29 PLUMBING NOTES #29.
 AIR CHAMBERS ARE NOT APPROVED. DELETE
 FROM REFERENCE.
 10) SHT A04 OF 29 UNITS A101 & A102
 SHALL COMPLY WITH FHA-98 AMENDED DESIGN
 MANUAL, REQUIREMENTS 1 THRU 7. DETAILS
 SHALL BE SUBMITTED. SHOW ALL BACKING PER
 REQ #6. SPECIFICATION "A" OR "B" BATH-
 ROOMS PER REQ. #7B, SHOW CLEAR FLOOR
 SPACE FOR ALL BATHROOM FIXTURES. SHOW
 OPENINGS FOR TOILETS, HEIGHT FOR LAVS.
 ECT.
  
 REVIEW BY KEN STEVENS