Date |
Text |
2003-08-08 00:00:00 | DENIED |
| |
| 1) SUBMIT COPY OF UNITY OF TITLE FOR THE |
| TWO LOTS. |
| |
| 2) SUBMIT A SOIL BORING TEST REPORT AS |
| REQUIRED BY CITY AMEND. TO FBC 1804.2.2. |
| |
| 3) THE A/C AREA LISTED ON A-3 OF THE |
| PLANS DOES NOT CORRESPOND WITH THE |
| CONDITIONED AREA ON THE ENERGY CALCS. OR |
| THE COUNTY IMPACT FEE STAMP. PLEASE |
| CORRECT. |
| |
| 4) SPECIFY ON THE PLANS THAT THE WIRE |
| MESH IN THE SLAB IS REQUIRED TO BE |
| SUPPORTED ON APPROVED MATERIALS AT NO |
| MORE THAN 3FT. OC. PER FBC 1909.3. |
| |
| 5) SPECIFY THE SIZE OF THE SOFFIT VENTS |
| ON A-6. SEE FBC 2309.7.1. |
| |
| 6) CONFLICTING DIMENSIONS ARE SPECIFIED |
| FOR THE STEEL COLUMN CAP IN DETAIL 1 ON |
| G2. PLEASE CORRECT. |
| |
| 7) TWO DETAILS ARE LABELED 1 ON G2. |
| |
| 8) FBC1609.4 NO LONGER ALLOWS THE ONE- |
| THIRD STRESS INCREASE FOR STEEL CALCS. |
| FOR COMBINATION LOADS. PLEASE REVISE |
| THE ANCHOR SCHEDULE ON G1 TO VALUES THAT |
| DO NOT INCLUDE THE INCREASE. SEE 2003 |
| USP CATALOG. |
| |
| 9) THE ENGINEER'S LICENSE NUMBER OR |
| CERTIFICATE OF AUTHORIZATION IS REQUIRED |
| TO BE IN THE TITLE BLOCK. SEE 61G15- |
| 23.002 |
| |
| 10) PROVIDE (2) CURRENT AND COMPLETE |
| COPIES OF SBCCI OR METRO-DADE PRODUCT |
| APPROVALS FOR: |
| - STRUCTURAL MULLIONS |
| - ARCHED TOP FIXED GLASS WINDOWS |
| |
| 11) SUBMIT A KEY PLAN AND INSTALLATION |
| SCHEDULE FOR THE STORM PANELS. THE |
| SHUTTER PLAN ON A-3 DOES NOT LIST THE |
| FRENCH DOORS OR THE SIDELITES AT THE |
| ENTRY DOOR. THE FOLLOWING INFORMATION IS |
| REQUIRED: TYPE OF ANCHORS, SPACING OF |
| ANCHORS, TYPE OF MOUNT, CONNECTION TYPE, |
| SHUTTER SPAN, AND OPENING PRESSURES. |
| |
| ROBERT MCDOUGAL |
| BLDG. PLAN REVIEW |
| (561)805-6714 |