Plan Review Notes For Permit 03060136 |
Permit Number |
03060136 |
|
Review Stop |
B |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2003-07-08 00:00:00 | CHECKLIST: | | 1-PROVIDE STORM SHUTTERS INFORMATION OR | | APPLY FOR A SEPARATE PERMIT. | | **NOTE: MAKE SURE ANCHOR SPACING FOR | | FRAMED WALL IS CORRECT. SEE ENGINEERED | | DRAWINGS FOR MINIMUM SPACING. | | 2-REVISE FRONT ELEVATION TO MATCH TYPE | | OF WINDOW SPECIFIED ON THE WINDOW | | SCHEDULE. | | 3-REVISE TRUSS ANCHOR SCHEDULE AND ALL | | DETAILS THAT ARE AFFECTED BY SECTION | | 1609.4.3 FBC 2001, WHICH DOES NOT | | ALLOW THE ALLOWABLE STEEL STRESS TO | | BE INCREASED. |
|