2003-07-18 00:00:00 | DENIED BY BUILDING |
| |
| 1) THE SITE SPECIFIC ENGINEERING DOES |
| NOT CORRESPOND TO THE WINDOW SIZES ON |
| THE PLANS. THE JOB/SITE LOCATION IS NOT |
| LISTED ON THE FORM. THE DESIGNER OF |
| RECORD IS REQUIRED TO SIGN AND SEAL THE |
| FORM OR PROVIDE A SIGNED AND SEALED |
| LETTER REFERENCING THE PRODUCTS AND |
| JOB LOCATION. |
| |
| 2) SUBMIT A LETTER FROM AL-FAROOQ CORP. |
| (SIGNED AND SEALED) STATING THAT THE |
| SITE SPECIFIC DRAWINGS FOR THE MULLIONS |
| HAVE BEEN REVIEWED AND APPROVED BY THEM |
| AS REQUIRED BY THE PRODUCT EVALUATION |
| DOCUMENT THAT WAS SUBMITTED. SEE NOTES |
| #3 AND D ON DRAWING NO. M96-08B. SHEET 1 |
| OF 3. |
| |
| 3)PROVIDE (2) CURRENT AND COMPLETE |
| COPIES OF SBCCI OR METRO-DADE PRODUCT |
| APPROVALS FOR: |
| - GLASS BLOCK |
| - 16' WIDE GARAGE DOOR |
| - DOUBLE OUTSWING FRONT DOORS |
| - STORM PANELS |
| |
| 4)THE PRELIMINARY SOIL REPORT RECOMMENDS |
| ADDITIONAL TESTING. CONTRACTOR WILL BE |
| CONTINUING AT HIS OWN RISK WITHOUT |
| ADDITIONAL TESTING. |
| |
| 5) STRUCTURE IS LOCATED IN AN "A0" FLOOD |
| ZONE AN ELEVATION CERTIFICATE WILL BE |
| REQUIRED. |
| |
| 6) THE ROOF SLOPE ON THE KNEZEVICH |
| SCHEDULE FOR THE STORM PANELS HAS THE |
| WRONG ROOF PITCH LISTED. THE PLANS |
| SPECIFY A 5 INCH PER FOOT ROOF SLOPE. |
| THE NEGATIVE PRESSURE FOR OPENING #14 |
| IS HIGHER ON THE KNEZEVICH SCHEDULE THAN |
| LISTED ON THE INSTALLATION SCHEDULE. |
| |
| ROBERT MCDOUGAL |
| BLDG. PLAN REVIEW |