Date |
Text |
2003-07-02 00:00:00 | BUILDING DENIED |
| |
| 1) THE STRUCTURE IS LOCATED IN AN "AO" |
| FLOOD ZONE AN ELEVATION CERTIFICATE WILL |
| BE REQUIRED PRIOR TO C.O. |
| |
| 2) ONE HOUR FIRE RATED GLASS BLOCK IS |
| REQUIRED AT THE ZERO LOT LINE. SUBMIT |
| MANUFACTURER'S SPECIFICATIONS AND |
| LISTING INFORMATION. |
| |
| 3) THE DOUBLE FRONT DOOR DOES NOT COMPLY |
| WITH EGRESS REQUIREMENTS. EXIT DOOR MUST |
| BE OF THE SIDE SWINGING TYPE WITH A MIN. |
| CLEAR OPENING OF 32". SEE FBC TABLE 1004 |
| AND SECTIONS 1003.2.3.1 AND 1012.1. |
| |
| 4) INDICATE THE LOCATIONS AND MATERIALS |
| FOR THE DRAFTSTOPPING THAT IS REQUIRED |
| AT THE FLOOR/CEILING ASSEMBLY. SEE FBC |
| 2305.2.2. |
| |
| 5) DETAIL 2 ON S-5 AND SECTION D-D ON |
| S-5 FOR THE GIRDER HANGER APPEAR TO BE |
| IN ERROR. THE CEILING HEIGHT (BOTTOM OF |
| THE GIRDER) IS 10'AND THE TOP OF THE |
| BOND BEAM IS AT 10'-8". THE TOP ANCHOR |
| HOLE IS AT 11', WHICH WILL BE ABOVE THE |
| BOND BEAM. SHEET S-1 INDICATES FILLED |
| CELLS BELOW THE BOND BEAM, BUT NOT ABOVE |
| IT. PLEASE CORRECT. |
| |
| 6) SAFETY GLAZING IS REQUIRED IN THE |
| MASTER BATHROOM WINDOW PER FBC 2405.2. |
| PLEASE INDICATE THIS ON PLANS. |
| |
| 7) WALL SECTION 1 ON A1.02 INCORRECTLY |
| SPECIFIES THAT THE ROOF SHEATHING IS |
| NAILED AT 16" O.C. SEE CITY AMENDMENTS |
| TO FBC TABLE 2306.1. PLEASE CORRECT. |
| |
| 8) FBC 1609.4 NO LONGER ALLOWS THE ONE- |
| THIRD INCREASE ON STEEL CALCULATIONS. |
| PLEASE REVISE THE CONNECTOR SCHEDULE ON |
| SHEET S-3. THE VALUES FOR THE SIMPSON |
| H-16, HETAL20, META16 AND USP RT24T ARE |
| INCORRECT. SEE THE 2003 USP AND 2002 |
| SIMPSON HIGH-WIND RESISTANT CONSTRUCTION |
| CATALOGS. |
| |
| 9) SUBMIT A KEY PLAN FOR THE STORM |
| PANELS. THE INSTALLATION SCHEDULE HAS |
| SOME ERRORS. THE PANELS ARE SPECIFIED AS |
| ALL BEING MOUNTED VERTICALLY, HOWEVER, |
| THE SHUTTER SPANS LISTED INDICATE THEY |
| ARE MOUNTED HORIZONTALLY. TABLE 5 ON THE |
| PRODUCT REQUIRE A MINIMUM PANEL LENGTH |
| OF 46",HOWEVER,SEVERAL PANELS ARE LESS |
| THAN 46". THE CALK-IN ANCHORS WILL NOT |
| WORK IN THE HOLLOW BLOCK THAT IS HIGH |
| LIGHTED ON THE PRODUCT APPROVAL. PLEASE |
| CORRECT. |
| |
| 10) SHEET A1.01 LISTS TOTAL A/C AREA AS |
| 1888 SQFT, HOWEVER, THE TOTAL FOR THE |
| 1ST AND 2ND FLOOR A/C AREAS THAT ARE |
| LISTED TOTALS 1960 SQFT. THE ENERGY CALC |
| LISTS CONDITIONED AREA AS 1888 SQFT. |
| PLEASE CORRECT. |
| |
| 11) PROVIDE (2) CURRENT AND COMPLETE |
| COPIES OF SBCCI OR METRO-DADE PRODUCT |
| APPROVALS FOR: |
| - THE FIXED GLASS TOMBSTONE (K) AND |
| ROUND (N) WINDOWS |
| - HORIZONTAL SLIDING WINDOWS (EXPIRED ON |
| 3-17-03) |
| - GARAGE DOOR (DOES NOT MEET REQUIRED |
| PRESSURES) |
| - DOUBLE OUTSWING FRONT DOOR (DOES NOT |
| MEET THE REQUIRED PRESSURES) |
| |
| ROBERT MCDOUGAL |
| BLDG. PLAN REVIEW |
| (561)805-6714 |