2003-06-18 00:00:00 | UNSAT |
| ~~~~~ |
| ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ |
| PLEASE PROVIDE THE FOLLOWING |
| INFORMATION,MAKE NECESSARY CHANGES TO |
| PLANS AND RESUBMIT FOR REVIEW. |
| |
| 1} PLEASE STATE THE CORRECT AMPERAGE OF |
| THE METER ENCLOSURE ON THE RISER |
| DIAGRAM. 500 AMPS DOES NOT CORRELATE TO |
| ANY U L LISTED METER ENCLOSURE. |
| |
| 2} PLEASE SUBMIT AIC RATINGS FOR |
| ALL NEW EQUIPMENT BEING INSTALLED. |
| MAINS/PANELS/BREAKERS MUST BE RATED FOR |
| THE AVAILABLE FAULT CURRENT PER 110-9. |
| |
| 3} PLEASE INDICATE THE NUMBER AND SIZE |
| OF THE CONDUCTORS IN THE 8"X8" GUTTER. |
| |
| 4} THE #4 JUMPER SHOWN IN THE GUTTER |
| FORMS A PARALLEL GROUND PATH WITH THE |
| NEUTRAL THAT IS APPARANTLY TO BE |
| GROUNDED AT THAT POINT,AND MUST BE |
| REMOVED. |
| |
| 5} THE #2 GROUNDING ELECTRODE CONDUCTOR |
| IS NOT SUFFICIENTLY SIZED FOR THE |
| SERVICE,SEE 250-66. |
| |
| 6} THE 1/0 CONDUCTORS ARE INCORRECT FOR |
| 250 AMP OVERCURRENT SHOWN FROM THE |
| DISCONNECT TO THE PANEL"A".310-15(B)(6). |
| |
| 7} PLEASE LIST THE REQ'D ARC |
| FAULT PROTECTED CIRCUITS ON PANEL |
| SCHEDULE OR NOTE ON PLANS FOR BRANCH |
| CIRCUIT PROTECTION. PER 210-12. |
| |
| 8} PLEASE LIST THE REQ'D BATH(S) |
| CIRCUIT(S). PER 210-11-C-3 |
| MUST BE 20A AND #12AWG. |
| |
| 9} A GFI MUST BE ADDED TO THE FRONT TO |
| COMPLY WITH 210-52(E) |
| |
| 10} THERE ARE TWO PANELS SHOWN ON THE |
| RISER DIAGRAM AND ONLY ONE SHOWN ON THE |
| PLAN.PLEASE SHOW ALL EQUIPMENT. |
| |
| 11} ALL BATH RECEPTACLES MUST COMPLY |
| WITH 210-52(D).SEE MASTER BATH. |
| |