Date |
Text |
2003-11-19 00:00:00 | DENIED: |
| PLEASE PROVIDE TRANSMITTAL LETTER WITH |
| RESPONSES TO COMMENTS TO HELP EXPEDITE |
| PLANS IN A MORE TIMELY MANNER. |
| |
| 1.PLAN SHEET A.45B DETAIL G, DRYER |
| VENT TO BE NON-SCREENED WITH A BACKDRAFT |
| DAMPER AND SHALL NOT PASS THRU PLENUMS |
| PER 2001 FBC(M) 504.4. |
| |
| 2.PLAN SHEET M1.03 CLARIFY MAKE-UP AIR |
| NEXT TO STAIRWELL PRESSURE RELIEF |
| (EXHAUST). |
| |
| 3.M1.03-INDICATES FLAMEBAR DUCT IN |
| STAIRWELL. PER 2001 FBC 1006.1.3.1, NO |
| DUCT PENETRATIONS THROUGH A STAIRWELL |
| EXCEPT FOR STAIRWELL PRESSURIZATION. |
| PLEASE PROVIDE SUBMITTAL FOR THE |
| FLAMEBAR DUCT. |
| |
| 4.M1.03-PROVIDE MANUFACTURER SUBMITTAL |
| DATA ON THE GENERATOR WILL THERE BE A |
| FILL TANK OR STORAGE? |
| |
| 5.SUPPLY DUCT FROM HP-G-1 APPEARS TO |
| PENETRATE A RATED WALL AT THE ELEVATOR |
| LOBBY AREA.FIRE DAMPERS ARE NOT |
| REQUIRED AS LONG AS ALL THE CONDITIONS |
| OF 607.1.3. |
| |
| 6.FLOORS 2 THRU 8 SUPPLY DUCT FROM |
| HP-C-1 REQUIRE A FIRE DAMPER AT THE |
| PENETRATION THRU THE WALL TO THE |
| CORRIDOR. |
| |
| 7.M1.03 THRU M1.09 INDICATE DOORS WITH |
| UNDERCUTS AND LOUVERS ARE THESE FIRE |
| RATED CORRIDORS?PLEASE CLARIFY. |
| |
| 8.M1.03 FIRE/SMOKE DAMPERS MISSING |
| FROM HP-G-5 WHERE DUCT PASSES THRU RATED |
| WALLS.PLEASE CLARIFY. |
| |
| 9.M2.01 & OTHERS INDICATE EXHAUST ON |
| TERMINATING ONTO THE TERRANCE PLEASE |
| NOTE PER 2001 FBC(M) 401.5.2, EXHAUST |
| OPENINGS SHALL BE LOCATED SO AS NOT |
| CREATE A NUISANCE. EXHAUST AIR SHALL NOT |
| DIRECTED ONTO WALKWAYS. |
| |
| 10. M2.01 NOTE ON PLAN INDICATES SPECFIC |
| DRYERS TO BE INSTALLED FOR INCREASED |
| VENTING CAPABILITY.PLEASE PROVIDE |
| MANUFACTURER SPECS FOR DRYER.DRYERS |
| TO BE INSTALLED FOR FINAL INSPECTION. |
| |
| 11. M.401 SMOKE CONTROL - PRESSURIZATION |
| OF CORRIDOR PLEASE CLARIFY HOW THIS |
| COMPLYS WITH 2001 FBC 412.5.WHERE WILL |
| THE SMOKE ON THE FLOOR OF INCIDENT BE |
| MIDIGATED TO? |
| |
| 12. AUXILIARY DRAIN PANS REQUIRED PER |
| 2001 FBC(M) 307.2.3. |
| |
| 13. PROVIDE OUTSIDE AIR CALCULATIONS FOR |
| ALL AREAS COMMON AND RESIDENTIAL PER |
| 2001 FBC(M) 403.3. |
| |
| 14. PROVIDE CALCULATIONS FOR COMBUSTION |
| AIR IN THE BOILER ROOM.PROVIDE MIMINUM |
| AIR REQUIREMENTS FOR ALL THE MECHANICAL |
| ROOMS.INDICATE CALCULATIONS ON PLAN. |
| |
| 15. PLEASE NOTE EXHAUST CONTAINING |
| NOXIOUS FUMES, DUST PARTICALS OR SMOKE |
| SHALL BE LOCATED A MINIMUM OF 10 FT |
| FROM ANY FRESH AIR INTAKE (INCLUDING |
| DOORS AND WINDOWS). |
| |
| 16. PLEASE INDICATE IF ANY OF THE |
| APPLIANCES ARE GAS. |
| |
| 17. PLEASE NOTE AS PER FS 471.025 AND |
| FAC 61G15-23.003, ALL PLANS SHALL BE |
| SIGNED (NOT INITIALED), SEALED AND DATED |
| BY THE ENGINEER OF RECORD.PLEASE |
| REVISE PLANS TO COMPLY. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE |
| CONTACT PATTY KRAUSS AT (561) 805-6719. |