2003-04-16 00:00:00 | BUILDING PLAN REVIEW |
| CONTINUED 4/16/03 |
| |
| 19) 1707.4.5.1 MULLIONS OCCURRING |
| BETWEEN INDIVIDUAL WINDOW AND GLASS |
| DOOR ASSEMBLIES. TESTING REPORTS ARE |
| REQUIRED BY AN APPROVED TESTING |
| LABORATORY OR BE ENGINEERED. |
| |
| 20) 1707.4.5.2 MULLIONS SHALL BE |
| DESIGN-ED TO TRANSFER THE DESIGN |
| PRESSURE LOADSAPPLIED BY THE WINDOW OR |
| DOOR ASSEMBLIESTO THE ROUGH OPENING |
| SUBTRATE. |
| |
| 21)1707.4.3 EACH EXTERIOR DOOR |
| ASSEMBLY NOT COVERED BY 1707.4.2 |
| (GLAZED DOORS) SHALL BE LISTED AND |
| TEST-ED FOR A PERIOD EQUAL TO THE |
| QUANITY |
| 3600/ V WHERE THE TIME PERIOD IS IN |
| SECTIONS AND V IS IN MILES PER HR TAKEN |
| FROM FIGURE 1606. THE TIME PERIOD SHALL |
| ALSO INCLUDE A 10 SECOND PERIOD AT A |
| LOAD EQUAL TO 1.5 TIMES THE DESIGN |
| PRESSURE. DADE COUNTY & SBCCI REPORTS |
| ARE ACCEPTED. |
| |
| 22)SITE SPECIFIC ENGINEERING (PRODUCT |
| APPROVAL) REQUIRES THE WET SIGNATURE, |
| DATE AND EMBOSSED SEAL OF THE ENGINEER |
| CERTIFYING THE PRODUCT AND SIGNATURE |
| AND SEAL OF THE DESIGN PROFESSIONAL |
| OF RECORD. SEE ATTACHMENT. |
| |
| 23) 1606.4.4 ANCHOR METHODS. PROVIDE |
| INFORMATION FOR INSTALLATION OF DOOR |
| AND WINDOW BUCKS. |
| |
| 24) 1707.4.4.1 ANCHOR REQUIREMENTS: |
| WINDOW & DOOR ASSEMBLIES SHALL BE |
| ANCHORED IN ACCORDANCE WITH THE |
| PUBLISHED |
| MANUFACTURER'S RECOMMENDATIONS TO |
| ACHIEVE THEDESIGN PRESSURE SPECIFIED. |
| SUBSTITUTE ANCHORING SYSTEM USED FOR |
| THE SUBSTRATE NOT SPECIFIED BY THE |
| FENESTRATION MANUFACTURER SHALL PROVIDE |
| EQUAL OR GREATER ANCHORING AS |
| DEMONSTRA-TED BY ACCEPTED ENGINEERING |
| PRACTICES. |
| |
| 25) SECTIONS; 103.6, 1606.4, 1707.4 |
| WPB IMPLEMENTATION STANDARD FOR HURRI- |
| CANE MISSLE IMPACT STANDARD, QUESTION |
| # 14, ARE REMOVABLE STORM PANELS APPRO- |
| PRIATE FOR USE ON VERY LARGE, MID OR |
| HIGH-RISE STRUCTURES? NO, EXCEPT ON THE |
| GROUND FLOOR. ON COMMERCIAL AND MULTI- |
| UNIT RESIDENTIAL STRUCTURES, ABOVE THE |
| FIRST LEVEL, IMPACT RESISTANT OR |
| PERMANENTLY AFFIXED PROTECTIVE DEVICES |
| SHALL |
| REQUIRE THE WRITTEN APPROVAL OF THE |
| BUILDING OFFICIAL. |
| PROVIDE STORM PANEL INFORMATION WITH |
| INSTALLATION SCHEDULE AND KEY PLAN WITH |
| SPECIFIC ANCHORS AND MOUNTING TO BE |
| USEDFOR ALL NON-IMPACT GLAZING. |
| FBC 1606.1.4. |
| FL BLD CODE 2001 SECTION 103.6, |
| 1606.1.4, 1707.4 & 3401.7.2.4. |
| PROCEDURES: 1(B) A COMPLETE |
| INSTALLATIONSCHEDULE SUMMARIZING & |
| IDENTIFYING |
| OPENING SIZES, STORY HEIGHTS, UNIT MARK |
| NUMBERS, UNIT SPANS/WIDTHS, UNIT STORM |
| BAR REINFORCING REQUIREMENTS, WALL |
| PRES-SURE ZONES, SLAT TYPES, ETC., |
| SHALL BE |
| SUBMITTED AT TIME OF PERMIT APPLICATION |
| TO FACILITATE PLAN REVIEW AND PERMIT |
| ISSUANCE. |
| |
| 26) SHEET S-5.1 STRUCTURAL NOTE (9): |
| BALCONY / TERRACE RAILINGS & STAIR |
| RAIL-INGS SHALL BE DESIGNED TO RESIST A |
| LOAD OF 50 LBS. APPLIED IN ANY |
| DIRECTION, |
| (1608.2.2.2) THIS SECTION REFERS TO |
| GAURD RAILS WITHIN DWELLING UNITS. |
| 1608.2.2.3 REFERS TO EXTERIOR GUARD |
| RAILSYSTEMS, BEING ABLE TO RESIST A 200 |
| LB |
| CONCENTRATED HORIZONTAL LOAD APPLIED ON |
| A 1 SQ FT AREA AT ANY POINT IN THE |
| SYSTEM INCLUDING INTERMEDIATE RAILS OR |
| OTHER ELEMENTS SERVING THIS PURPOSE. |
| |
| 27) SHEET S-1.38 PREFAB METAL TRUSS |
| CON-NECTIONS SEE SCHEDULE "D,E& F" THE |
| 2003 USP CATOLOG, FORMULTIPLE ANCHOR |
| INSTAL- LATIONS NOTE: MULTIPLE |
| INSTALLATIONS NOTCLOSER THAN 8", A |
| DERATING FACTOR WILL |
| BE REQUIRED BECAUSE CONE FAILURE. |
| *****NEW IN FL CODE**** |
| 1609.4.3 LOAD REDUCTIONS!!!!! |
| |
| 28) SHEET A-1 GENERAL NOTES: 34 MINIMUM |
| FLAME SPREAD TO BE IN CONFORMANCE WITH, |
| ID-11.1 INTERIOR FINISHES, NO INFORMA- |
| TION ABOUT TABLE 803.3 FLAME SPREAD/ |
| SMOKE DEVELOPMENT. |
| TABLE 803.3 MINIMUM INTERIOR FINISH |
| CLASSIFICATION; PROVIDE INFORMATION |
| BASED ON INTERIOR FINISH REQUIREMENTS |
| BASED ON OCCUPANCY. |
| |
| 29) EXTERIOR WALLS PRESSURE TREATED |
| FURRING ALLOWED IF THE FOLLOWING |
| REQUIREMENTS ARE MET, 803.9.1. |
| |
| 30) INTERIOR WALLS, BACKING TO BE NON- |
| COMBUSTIBLE MATERIAL OR FIRE RETARDANT |
| TREATED WOOD. 609.2.1. |
| |
| 31) GYMNASIUM AN A-2 SMALL ASSEMBLY, |
| INDICATE 2 HR WALLS W/ 1 1/2 HR PROTEC- |
| TIVES. |
| |
| 32) GYMNASIUM REQUIRES 2 MEANS OF |
| EGRESS11-4.1.3 (9) IN A BUILDING OR |
| FACILITIESOR PORTION S OF BUILDINGS OR |
| FACILITIES REQUIRED TO BE ACCESSIBLE, |
| ACCESSIBLE |
| MEANS OF EGRESS SHALL BE PROVIDED IN |
| THESAME NUMBER AS REQUIRED BY THE LOCAL |
| BUILDING LIFE SAFETY REGULATIONS. |
| THE GYM DOES HAVE 2 EXITS BUT ONLY |
| ONE IS ACCESSIBLE!!! |
| |
| 33) GYMNASIUM EGRESS DOORS, 1019.7.2 |
| EACH DOOR IN A MEANS OF EGRESS FROM AN |
| AREA OF A GROUP A OCCUPANCY MAY BE PRO- |
| VIDED WITH A LATCH OR LOCK ONLY IF IT |
| ISPANIC HARDWARE OR FIRE EXIT HARDWARE, |
| WHICH RELEASES WHEN 15 LBS IS APPLIED |
| TOTHE RELEASING DEVISE. THIS DOOR ALSO |
| INDICATES A CARD READER, PROVIDE |
| INFORMATION FOR FAIL SAFE RELEASE? |
| |
| 34) SHEET A-3-5DA STAIRWELL # 1, HAS A |
| ROOMIN THE STAIRWELL, NO DESIGNATION? |
| IS THIS A AREA OF REFUGE? INACCESSIBLE |
| TO HANDICAPPED PEOPLE! |
| STAIWELL# 1 HAS NO DOOR AT THE END |
| OF THE VERTICAL SECTION, TO CONTINUE |
| THERATING OF 2 HRS,ALSO SEE 1006.1.3.1 |
| FOR WHAT IS ALLOWABLE IN THE STAIRWELL. |
| |
| 35) 705.2.4.3 REFUSE CHUTE ACCESS ROOMS. |
| ACCES OPENINGS FOR REFUSE CHUTES SHALL |
| BE LOCATED IN ROOMS OR COMPARTMENTS |
| COMPLETELY ENCLOSED BY CONSTRUCTION & |
| OPENING PROTECTIVES IN ACCORDANCE WITH |
| TABLE 705.1.2. ACCESS OPENINGS TO REFUSE |
| CHUTES SHALL NOT BE LOCATED IN EXIT |
| ACCESS CORRIDORS OR EXIT ENCLOSURES. |
| ***SHEETA-3-6AB*** |
| 36) ELEVATOR LOBBY VS ENTRY DOOR TO |
| SUITE, COMMON TO ALL FLOORS. |
| 412.6.3 REVIEW WHAT DORS AREN'T ALLOWED |
| IN ELEVATOR LOBBIES, GUEST ROOM DOOR |
| |
| 37)SAME SHEET GRID 8/C, STORAGE UNIT, |
| WHAT TYPE OF STORAGE, S1 OR S2? |
| WALL RATING? |
| |
| 38) UNIT H210 BALCONY DETAIL 3/A8.11 |
| NO SUCH DETAIL? |
| |
| 39) SHEET A-8.12 GUARDRAILS: WITHIN |
| INDIVIDUAL LIVING UNITS OR GUEST ROOMS |
| MAY BE 36",1026.5.1. |
| EXTERIOR GUARDRAIL HEIGHT,MINIMUM IS |
| 42"1015.2. |
| 1015.3 OPENINGS: SO A 4" SPHERE CAN NOT |
| PASSTHROUGH ANY OPENING. A BOTTOM RAIL |
| OR CURB SHALL BE PROVIDED THAT WILL |
| REJECT THE PASSAGE OF 2" DIAMETER SPHERE |
| |
| 40) STAIRWAY GUARDRAILS 1015.3 SEE |
| EXCEPTION (1) A 6" SPHERE SHALL NOT |
| PASSTHROUGH THE TRIANGLE OPENING FORMED |
| BY |
| A TREAD, RISER AND BOTTOM OF A GUARDRAIL |
| SEE A-10.07 DETAIL #2. |
| |
| 41) SHEET A-10.02 DETAILS 1 & 6 |
| RE: EXPANDED POLYSTYRENE MOLDING, THIS |
| MATERIAL IS NOT ALLOWED IN THE FIRE |
| DISTRICT. SEE F 102.2.7 ARCHITECTURAL |
| TRIM ON BUILDINGS LOCATED IN THE FIRE |
| DISTRICT SHALL BE CONSTRUCTED OF |
| APPROVED NONCOMBUSTIBLE MATERIALS OR |
| FIRE RETARDANT TREATED WOOD. |
| |
| THIS SESSION OF PENEMATION WILL NOT |
| EXCEPT MORE THAN 200 LINES, A THIRD |
| BUILDING REVIEW WILL NEED TO BE OPENED. |
| THE SAME SIZE AS ROOF DRAINS, INSTALLED |
| WITH THE INLET FLOW LINE LOCATED 2" |
| ABOVE THE LOWEST POINT OF THE ROOF LINE. |
| OVERFLOW SCUPPERS SHALL BE A MINIMUM OF |
| 4"IN HEIGTH AND SHALL BE PLACED IN WALLS |
| OR PARARETS WITH THE INLET FLOW LINE |
| NOT LESS THAN 2" ABOVE THE ROOF SURFACE. |