2003-04-03 00:00:00 | DENIED |
| REFERENCE: FBC-2001 PLUMBING |
| FBC-2001 CHAPTER 11 |
| |
| 1) SHT A1 ENLARGED RESTROOM PLAN. LAV TO |
| BE 1'3" OFF WALL. WATER CLOSET SHALL BE |
| 17" TO 19" MEASURED TO THE TOP OF THE |
| TOILET SEAT. 11-4.16.3 |
| 2) SHT A2 DETAIL #3, LAV TO BE 1'3" OFF |
| WALL TO CENTER. BREAK ROOM (207) SINK |
| TO COMPLY WITH 11-4.24 AND ALL SUBSECT- |
| IONS. PLEASE SUBMIT DETAILS. - PLEASE |
| SUBMIT DETAILS FOR DRINKING FOUNTAIN TO |
| SHOW COMPLIANCE WITH 11-4.15 AND ALL SUB |
| SECTIONS. SHOW CLEAR FLOOR SPACE. |
| 3) SHT A3 PROVIDE CALCULATIONS FOR PRIM- |
| ARY AND SECONDARY ROOF DRAINS PER SEC'S. |
| 1106, & 1107. SHOW 1/2 AREA OF ALL VERT- |
| ICAL WALLS INCLUDING PARAPETS. INCLUDE |
| AREAS OF ALL ROOFS DRAINING FROM ABOVE. |
| SHOW SIZE OF ALL OPENINGS FOR DOWNSPOUTS |
| - SCUPPER |
| SHOW SIZE OF ALL DOWNSPOUTS |
| 4) SHT P1 WILL THERE BE CHEMICALS STORED |
| AND USED? IF SO MSDS SHEETS WILL BE REQD |
| AND EMERGENCY SHOWER MAY BE REQUIRED DE- |
| PENDING ON MSDS SHEETS. |
| 5) RPZ BACKFLOW REQUIRED ON BLDG WATER |
| SERVOCE. |
| 6) SHT P2 WATER HEATER DETAIL. SECTION |
| 504.2 VACUUM RELIEF REQUIRED. SECTION |
| 607.3.2 THERMAL EXPANSION CONTROL REQD.' |
| SECTION 504.5 THE RELIEF VALVE SHALL NOT |
| BE USED AS MEANS OF THERMAL EXPANSION |
| CONTROL. |
| 7) A SERVICE SINK IS REQUIRED PER TABLE |
| 403.1 (STORAGE) |