2003-04-28 00:00:00 | DENIED |
| REFERENCE: FBC-2001 PLUMBING |
| FBC-2001 FUEL GAS |
| FBC-2001 CHAPTER 11 |
| FHA-AMEND 98 DESIGN MANUAL |
| |
| 1) FROM PREVIOUS REVIEW. INDICATE THE |
| OPENINGS FOR THE W/C'S (WATER CLOSETS) |
| PER FHA DESIGN MANUAL. (#2) SHT A5.1.08 |
| 2) FROM PREVIOUS REVIEW. (#7) THE DRAIN |
| FROM THE SPRINKLER SHALL DRAIN TO SANT. |
| NOT STORM. INDIRECT WASTE INTO A FLOOR |
| SINK IS REQUIRED. SHT P-2 |
| 3) FROM PREVIOUS REVIEW. (#8) THE BACK- |
| WASH FROM THE POOL FILTERS SHALL DRAIN |
| TO SANITARY. SHT P-5/P-4 |
| 4) FROM PREVIOUS REVIEW. (#9) PLEASE |
| NOTE THAT THE 3" COLD WATER RISER ON SHT |
| P2 IS NEXT TO THE COLUUM ON SHT P-2 AND |
| P-3 BUT CHANGES TO 4" COLD WATER ON SHT |
| P-4, AND CHANGES BACK TO 3" ON SHT P-5. |
| 4" DOMESTIC FEED IS SHOWN ON SHTS P-2, & |
| P-3 BUT CHANGES TO 3" ON SHT P-4 THEN |
| BACK TO 4" ON SHT P-5. PLEASE CLAIRFY. |
| 5) FROM PREVIOUS REVIEW. (#16) TWO AREAS |
| HAVE PIPE SIZE THAT IS TOO SMALL. PLEASE |
| CORRECT PIPE SIZE. SHT P-16 |
| 6) FROM PREVIOUS REVIEW. (#17) CLEANOUTS |
| REQUIRED PER 708.3.1, 708.3.3 & 708.3.4 |
| PLEASE SHOW ON PLANS. |
| 7) FROM PREVIOUS REVIEW. (#18) RELIEF |
| VENTS REQUIRED IN SOIL AND WASTE STACKS |
| HAVING MORE THAN 10 BRANCH INTERVALS. |
| PLEASE SHOW ON RISERS. |
| 8) FROM PREVIOUS REVIEW. (#20) SOME |
| PIPES ARE UNDERSIZED FOR THE AMOUNT OF |
| FIXTURE UNITS. SEE 4" @ 251 FU & 4" @ |
| 254 FU. SHT P-16 |
| 9) SHT P-18 STORM BLDG DRAIN AND RISERS, |
| SOME SIZES WRONG AND PIPE SIZING NOT |
| SHOWN ON SOME PIPES. ALSO SQUARE FOOTAGE |
| NOT SHOWN FOR GD'S. PLEASE SIZE ALL PIPE |
| AND CORRECT THE SIZE FOR THOSE SECTIONS |
| THAT HAVE MORE SQ FT THAN ALLOWED BY |
| TABLE 1106.3 @ 4.5 INCHES PER HOUR RAIN- |
| FALL. |
| 10) FROM PREVIOUS REVIEW. (GAS #6) SUB- |
| MIT CALCULATIONS FOR COMBUSTION AIR, PER |
| FBC-2001 FUEL GAS CODE SECTION 304. |
| RESPONSE NOTED, BUT NO CALCULATION FOUND |
| SHTS 17 OR 8. |
| 11) FROM PREVIOUS REVIEW. (GAS #9) |
| SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| EQUIPMENT TO VERIFY COMPLIANCE WITH |
| STANDARDS NFPA 54, NFPA 58, AND THE |
| FBC-2001 FUEL GAS CODE SEC 402.2 |
| 12) SHT P-18 PLEASE INDICATE WHICH TABLE |
| FROM THE FBC-2001 GAS CODE WILL BE USED |
| FOR SIZING THE GAS SYSTEM. WE HAVE NOT |
| ADOPTED THE NFPA-54 CODE. |
| |
| REVIEW BY KEN STEVENS |
| (561) 659-8096 EXT 8377 |
| (561) 805-6721 |
| FAX (561) 653-2692 |