Date |
Text |
2003-03-15 00:00:00 | DENIED |
| REFERENCE: FBC-2001 PLUMBING |
| FBC-2001 FUEL GAS |
| FBC-2001 CHAPTER 11 |
| FHA-AMEND 98 DESIGN MANUAL |
| |
| 1) SHT A5.1.05 DETAIL #1 EMPLOYEE REST- |
| ROOM, DOOR CAN NOT OPEN INTO THE CLEAR |
| FLOOR SPACE OF ANY FIXTURE OR THE 5' |
| TURNING CIRCLE. 11-4.22.2. TURNING RADI- |
| US SHALL BE UNOBSTURCTED. |
| 2) SHT A5.1.08 UNIT BATHROOM INTERIOR |
| ELEVATIONS, INDICATE OPENINGS FOR W/C'S |
| AND LAV HEIGHTS PER FHA DESIGN MANUAL. |
| 3) SHT A-7.1.0.6 ROOF DRAINS FOR CANOPY, |
| PLEASE PROVIDE DRAIN DETAIL, PIPING |
| DIAGRAM AND SHOW WHERE THE PIPING TERM- |
| INATES. |
| 4) SHT A-7.1.1.6 DETAIL #1 BREAKROOM |
| ELEVATION, PER SECTION 11-4.24.2, MAX. |
| HEIGHT FOR SINK SHALL BE 2'10". 2'11" |
| SHOWN. |
| 5) SHTS P-2 AND P-16, VENTS REQUIRED FOR |
| FLOOR DRAINS IN PUMP ROOMS. |
| 6) SHT P-2 MORE INFORMATION REQUIRED FOR |
| DEEP STORAGE TANK IN TRANSFORMER VAULT. |
| IS THERE ANY PIPING FOR THIS TANK? WHAT |
| WILL BE STORED? |
| 7) SHT P-2 NUMBER 4 IN BOX INDICATES A |
| 3" SPRINKLER DRAIN, BUT WAS UNABLE TO |
| LOCATE. THIS SHALL DRAIN TO SANITARY. |
| PLEASE INDICATE WHERE THIS DRAIN IS. |
| 8) SHT P-5 POOL EQUIPMENT ROOM SHOWS A |
| 6" HUB DRAIN, BUT IS NOT SHOWN ON ANY |
| RISER. PLEASE INDICATE WHAT THE DRAIN IS |
| FOR AND WHERE IT PIPES TO. IF IT IS AN |
| INDIRECT WASTE IT WILL REQUIRE A FLOOR |
| SINK AND SHALL PIPE TO SANITARY. |
| 9) SHT P-3 3" WATER FOR COOLING TOWER & |
| 5" DOMESTIC WATER CHANGES ON SHT P-4, & |
| CHANGES BACK ON SHT P-5. PLEASE CLAIRFY. |
| 10) SHT P-6 SANITARY DRAIN LINES DO NOT |
| REFLECT FIXTURE LAYOUT FOR PUBLIC BATH- |
| ROOM DETAIL. |
| 11) SHT P-8 WATER SUPPLY LINES FOR COOL- |
| ING TOWER SHOWS 3" SUPPLY FROM PUMP, AND |
| ANOTHER 3" LINE (#7) TYING INTO THE SYS- |
| TEM. WHERE IS THIS LINE COMMING FROM. IS |
| THIS A CROSS CONNECTION FROM THE DOMES- |
| TIC WATER? PLEASE CLAIRFY. |
| 12) SHTS P-9 UNIT A-1, & P-10 UNITS B-2A |
| B-3, & B-2B, SECTION 909.1 WET VENT. |
| ONLY THE FIXTURES WITHIN THE BATHROOM |
| GROUP SHALL CONNEDT TO THE WET-VENTED |
| HORIZONTAL BRANCH DRAIN. THE WASHMACHINE |
| ON THESE STACKS SHALL DRAIN DOWNSTREAM |
| OF THE BATHROOM GROUPS. ALSO MAKE CHANG- |
| ES TO RISER DIAGRAM SHT P-13. |
| 13) SHT P-12 WATER RISER DIAGRAMS (ALL). |
| AIR CHAMBERS ARE NOT APPROVED. PLEASE |
| DELETE THESE FROM THE RISER DIAGRAMS. |
| 14) WATER RISER FOR PUBLIC BATHROOMS DO |
| NOT REFLECT THE FIXTURE LAYOUT. NO WATER |
| TO THE SHOWERS, DRINKING FOUNTAINS NOT |
| SHOWN ON MENS, 4 LAVS IN WOMENS ROOM. |
| PLEASE CLAIRFY. |
| 15) SHT P-16 SANT. RISER TO PUBLIC BATHS |
| DO NOT REFLECT THE FLOOR PLAN. |
| 16) SHT P-16 PLEASE INDICATE PITCH FOR |
| ALL SANITARY PIPE. ALL PIPE WILL BE RUN |
| AT A UNIFORM PITCH. SIZING INDICATES |
| 1/2" PER FOOT REQUIRED FOR SIZE OF PIPE |
| AND NUMBER OF FIXTURES UNITS. |
| 17) SHTS P-2 & P-16 CLEAN OUTS REQUIRED |
| PER SECTION 708.3.1 IN THE BLDG DRAIN, |
| MAX. 100', PER SECTION 708.3.4 AT CHANGE |
| OF DIRECTION OVER 45 DEGREES, AND AT THE |
| BASE OF EACH STACK PER 708.3.4. PLEASE |
| SHOW C/O'S WHERE REQUIRED. |
| 18) SHT P-13 SOIL AND WASTE STACKS IN |
| BLDGS. HAVING MORE THAN 10 BRANCH INTER- |
| VALS SHALL BE PROVIDED WITH A RELIEF |
| VENT AT EACH 10TH INTERVAL INSTALLED BE- |
| GINNING WITH THE TOP FLOOR. SEC 914.1 |
| 19) PLEASE PROVIDE A HORIZONTAL CONDEN- |
| SATE BLDG DRAIN LINE. SHOW ALL PIPE |
| SIZES, POINT OF TERMINATION, AND SUPPLY |
| CALCULATIONS FOR GALLONS PER MINUTE OF |
| DISCHARGE FOR SYSTEM. SYSTEM SHALL RUN |
| SEPARATELY OUT OF BLDG WITH A RELIEF |
| VENT AS IS EXITS BLDG. |
| 20) PLEASE PROVIDE A HORIZONTAL BLDG |
| STORM DRAIN. SHOW ALL PIPE SIZES, PITCH, |
| ACCUMULATED SQUARE FOOTAGE, AND TERMIN- |
| ATION POING. |
| 21) PLEASE PROVIDE A STORM RISER DIAGRAM |
| SHOW ALL ROOF DRAIN SIZES, SQ FT DRAINED |
| PIPE SIZE, PITCH, AREA DRAINS, AND |
| PLANTER DRAINS WITH ACCUMULATED SQ FT. |
| 22) HEALTH DEPT REVIEW REQUIRED FOR |
| FACILITIES FOR POOLS. |
| 23) SEPARATE PERMIT REQUIRED FOR POOLS. |
| 24) A GREASE TRAP WILL PROBABLY BE REQ- |
| UIRED IF ANY OF THE USES FOR THE RETAIL |
| SPACE MENTIONED ON SHT G-4 THAT PREPARE |
| OR SERVE FOOD ARE USED. IN THAT EVENT, |
| PER UTILITY ORD #2938-96 RODNEY COMPO, |
| ENVIRONMENTAL COMPLIANCE WILL BE CONTAC- |
| TED FOR GREASE TRAP SIZE. (561) 837-4074 |
| 25) SHT P-8 COOLING TOWER DRAIN TO SAN- |
| ITARY AND OVER FLOW TO STORM. |
| 26) SHT P-8 SHOWS 3" GAS LINE AT WATER |
| HEATERS, BUT P-2 SHOWS ONLY 2" GAS AT |
| METER. PLEASE CLAIRFY. |
| 27) SEPARATE GAS PERMIT REQUIRED. THE |
| FOLLOWING IS REQUIREMENTS FOR APPLYING. |
| 1. SUBMIT AN ISOMETRIC DRAWING THAT |
| CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| AND CORRESPONDING LENGTHS PER FBC-2001 |
| FUEL GAS CODE. |
| 2. SHOW TYPE OF PIPING MATERIAL BEING |
| INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| NUMBER OF CORRUGATED STAINLESS STEEL |
| TUBING FOR EACH PIPE SIZE BEING USED. |
| 3. TYPE OF GAS, (LP OR NATURAL) |
| 4. BTU LOAD OF EACH APPLIANCE AND THE |
| TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| THE FBC-2001 FUEL GAS CODE SECS. 401.8 |
| THRU 402.5.2 AND TABLES 402(1) THRU |
| 402(34). |
| 5. SHOW THE DISTANCE FROM THE POINT OF |
| DELIVERY, (METER), TO THE MOST REMOTE |
| OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| FBC-2001 FUEL GAS CODE APPENDIX A - USE |
| OF CAPACITY TABLES (A)(3). |
| 6. SUBMIT CALCULATIONS FOR COMBUSTION |
| AIR (IF APPLICABLE) PER FBC-2001 FUEL |
| GAS CODE SECTION 304. |
| 7. INDICATE THE DELIVERY PRESSURE (PSI) |
| PER FBC-2001 FUEL GAS CODE SEC. 402.2. |
| NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| 8. SUBMIT A DETAIL SHOWING THE TYPE, |
| LOCATION, SIZE AND TERMINATION OF THE |
| GAS VENTS PER FBC-2001 FUEL GAS CODE |
| SECS. 502 THRU 506. |
| 9. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| EQUIPMENT TO VERIFY COMPLIANCE WITH |
| STANDARDS NFPA 54, NFPA 58, AND THE |
| FBC-2001 FUEL GAS CODE SEC 402.2 |
| 10. CLEARLY SHOW THE LOCATION AND CAP- |
| ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| OR ASME), THE DISTANCE OF THE TANK FROM |
| THE BUILDING AND ADJACENT PROPERTY LINES |
| THE DISTANCE OF THE TANK FROM ALL SOUR- |
| CES OF IGNITION, OTHER CONTAINERS, BUILD |
| INGS, AND THE LOCATION OF ANY BUILDING |
| OPENINGS BELOW THE RELIEF VALVE OF THE |
| TANK PER NFPA 58, TABLE 3-2.2.2. |
| 11. CLEARLY INDICATE ON THE PLAN IF THE |
| LP TANK IS ABOVE OR BELOW GROUND, AND |
| SHOW REQUIRED PROTECTION OF THE TANK AND |
| APPURTENANCES PER NFPA 58. IF THE TANK |
| IS BELOW GROUND THE CONTAINER SHALL BE |
| SECURILY ANCHORED PER NFPA 58 SECTION |
| 3-2.2.7(H). |
| 28) SEPARATE PERMIT REQUIRED FOR GREASE |
| TRAP. |
| 29) SEPARATE PERMIT REQUIRED FOR IRRIGA- |
| TION. |
| 30) SHT P-2 PENETRATIONS INTO AND OPEN- |
| INGS THROUGH A STAIRWAY ENCLOSURE ASSEM- |
| BLY ARE PROHIBITED EXCEPT FOR REQUIRED |
| EXIT DOORS, DUCTWORK AND EQUIPMENT NEC- |
| ESSARY FOR INDEPENDENT STAIR PRESSUREIZ- |
| ATION, SPRINKLER PIPING, STANDPIPES AND |
| ELECTRICAL CONDUIT SERVING THE STAIRWAY |
| AND TERMINATING ATY A STEEL BOX. - THE |
| GAS LINE RUNNING THROUGH THE STAINWAY IS |
| NOT ALLOWED.SECTION 1006.1.3.1 |
| 30)........... |
| LOOK FOR COMMENTS BY THE OTHER PLAN |
| REVIEW DISCIPLINES THAT MAY BE WRITTEN |
| ON THE APPLICATION, PLANS, OR ATTACHED |
| SEPARATELY. WHEN RESUBMITTING PLANS |
| PLEASE CLEARLY INDICATE THE REVISION AND |
| REMOVE AND REPLACE ANY PAGES AS NECESS- |
| ARY. SUBMIT (1) SET OF OLD DRAWINGS WITH |
| THE PLANS WHEN RESUBMITTING PLANS. A |
| TRANSMITTAL LETTER LISTING THE ORIGINAL |
| REVIEW NUMBER, WITH A DESCRIPTION OF THE |
| REVISION MADE, IDENTIFYING THE SHEET OR |
| SPECIFICATION PAGE WHERE THE CHANGES CAN |
| BE FOUND, WILL HELP TO EXPEDITE YOUR |
| PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| |
| REVIEW BY KEN STEVENS |
| (561) 659-8096 EXT 8377 |