2003-02-06 00:00:00 | DENIED |
| REFERENCE: FBC-2001 PLUMBING |
| FHA-AMEND 98 DESIGN MANUAL |
| |
| 1) DUE TO THE NATURE OF THE JOB, ALL |
| WORK SHALL BE CONSIDERED NEW CONSTRUCT- |
| ION. FHA-98 WILL BE ENFORCED AT THIS |
| TIME FOR UNITS #1, 2 & 3. PER DESIGN |
| MANUAL, REQUIREMENTS 1 THRU 7 SHALL BE |
| SHOWN ON PLANS. SPECIFICATION "A" OR "B" |
| WILL BE SHOWN FOR ALL BATHROOMS. ALL |
| CLEAR FLOOR SPACE WILL BE SUPERIMPOSED |
| ON PLANS FOR BATHROOMS AND KITCHEN. |
| BACKING LOCATIONS, LENGTH & HEIGHT RE- |
| QUIREMENTS DETAIL SHALL BE SUBMITTED. |
| 2) SHTS P-2 & P-3 FLOOR PLAN AND SANT. |
| RISER DIAGRAM, PER SECTION 909.1 WET |
| VENT-ONLY THE FIXTURES WITHIN THE BATH- |
| ROOM GROUP SHALL CONNEDT TO THE WET- |
| VENTED HORIZONTAL BRANCH DRAIN. ANY |
| ADDITIONAL FIXTURES SHALL DISCHARGE |
| DOWNSTREAM OF THE WET VENT. |
| 3) A WATER RISER DIAGRAM IS REQUIRED. |
| SHOW ALL WATER HAMMER ARRESTORS REQUIRED |
| BY 604.9, (WASH MACHINE, DISHWASHER, & |
| ICE MAKER), AND LOCATED AS REFERENCED BY |
| THIRD NOT ON SHEET P-2. |
| 4) SHT P-3 NOTE #12, AIR CHAMBERS ARE |
| NOT APPROVED. PLEASE DELETE FROM REFER- |
| ENCE. |
| |
| REVIEW BY KEN STEVENS |
| (561) 659-8096 EXT 8377 |