2003-01-07 00:00:00 | FAILED: |
| 1. PLEASE NOTE THAT A SEPARATE PERMIT |
| APPICATION AND FEES FOR UNDERGROUND |
| UTILITIES AND CIVIL SITE WORKS WIIL BE |
| REQUIRED. |
| 2. SIDEWALK, CURB AND GUTTERS AS |
| REQUIRED BY THE PLANNING DEPARTMENT (SEE |
| ATTACHED LETTER) AROUND THE PROPERTY, |
| MUST BE SHOWN, PLEASE COORDINATE WITH |
| CITY ENGINEER'S OFFICE FOR THE |
| REQUIREMENTS. 659-8040 MR. RICHARD |
| PITTMAN. |
| 3. ALL DRIVEWAYS MUST BE CONSTRUCTED PER |
| CITY' STANDARDS AND RQUIREMENTS. |
| 4. A CLEAN OUT MUST BE INSTALLED IN |
| SEWER LATERALS IF ONE IS NOT THERE, IT |
| SHALL BE THE RESPONSIBILITY OF THE |
| DEVELOPER/ENGINEER/DEVELOPER TO DESIGN |
| AND INSTALL THE NEW INVERT ELEVATION FOR |
| THE BUILDING LATERAL TO MACH OR BE |
| HIGHER THAN THE EXISTING WHILE MAINTAIN- |
| ING THE PLUMBING CODE REQUIREMENT FOR |
| EFFLUENT PIPE FALL WITH MINIMUM OF THREE |
| FEET COVER. IF THESE REQUIREMENTS CAN NO |
| T BE MET, THE CITY MUST BE NOTIFIED |
| PRIOR TO INSTALLATION.659-8040, 659-8079 |
| 5. ALL BACKFLOW PREVENTERS AND |
| CONNECTIONS TO CITY SERVICES MUST BE |
| APPROVED BY PUBLIC UTILITIES ENGINEERING |
| SERVICES DEPT. 659-8040 MR. MANNY |
| GONZALEZ. |