Date |
Text |
2003-01-14 00:00:00 | BUILDING REVIEW APPROVED WITH PROVISO: |
| 1-PROVIDE SOIL TEST REPORT. |
| 2-CLEARLY SPECIFY SPACING SUPPORTS FOR |
| WWM IN CONCRETE SLAB. SEE SECTION |
| 1909.3 FBC 2001. |
| 3-STEEL BOLLARD TO PROTECT WATER HEATER: |
| SPECIFY HEIGHT OF COLUMN AND CLARIFY |
| HOW IS THE COLUMN GOING TO RESIST THE |
| IMPACT LOAD WITH ONLY 4" EMBEDMENT |
| INTO CONCRETE SLAB. SEC. 104.2.1.2 |
| CITY AMENDMENTS TO FBC 2001. |
| 4-PROVIDE ATTIC ACCESS PANEL AT SECOND |
| FLOOR ROOF. SEC. 2309.6 FBC 2001. |
| 5-PROVIDE CERTIFICATE OF COMPLIANCE AND |
| ISTALLATION AFFIDAVIT FOR SITE |
| SPECIFIC STORM SHUTTERS INSTALLATION |
| AS REQUIRED BY THE CITY IMPLEMENTATION |
| STANDARD FOR HURRICANE MISSILE IMPACT |
| PROTECTION (ITEMS 15, 16 AND 17) |
| 6-PROVIDE PRODUCT APPROVAL FOR: |
| A)GARAGE DOORS NEED LEGIBLE DRAWINGS AND |
| MAKE SURE THEY MEET DESIGN PRESSURES |
| CALCULATED BY THE ARCHITECT. |
| B)OUTSWING DOORS WITH APPROVED DRAWINGS |
| THAT MATCH UPDATED PRODUCT APPROVAL. |
| (NEED STAMPED DADE COUNTY DRAWINGS |
| WITH NEW UPDATED PRODUCT APPROVAL #). |