2002-11-22 00:00:00 | FAILED: |
| 1. INADEQUATE INFORMATIONS FOR CIVIL |
| ENGINEERING REVIEW; |
| A. PLEASE PROVIDE STORM WATER CALC. |
| FOR OUR REVIEW AND APROVAL. |
| B. DETAILS FOR THE PROPOSED EXFILTRATION |
| MUST BE PROVIDED. |
| C. PLEASE SHOW DETAILS, TYPE FOR THE |
| CATCH BASINS. |
| D. PLEASE SHOW HOW THE EXISTING LOT AS |
| SHOWN IS BEING ACCSESSED. |
| E. ALL DRIVEWAYS MUST BE CONSTRUCTED PER |
| CITY OF WPB REQUIREMENTS AND STANDARD. |
| F. DUMSTER ENCLOUSRE MUST BE CONSTRUCTED |
| PER CITY OF WPB, IF TO BE PICKED UP BY |
| THE CITY. |
| G. POLLUTION PREVENTION PLAN MUST BE |
| PROVIDED, NOTE TO THE CONTRACTOR. |
| H. A RPZA BACKFLOW PREVENTER WILL NEED |
| TO BE INSTALLED, IF NOT ALREADY IN PLACE |
| ,AT THE WATER METER ON PRIVATE PROPERTY. |
| ALL BACKFLOW PREVENTERS MUST COMPLETLY |
| HIDDEN FOM VIEW WITH SHRUBS PRIOR TO |
| ACTIVATION.SHOW THE LOCATION IF THERE |
| IS ONE. |
| I. A CLEAN OUT WILL NEED TO BE INSTALLED |
| IN SANITARY SEWER LATERAL, ON THE |
| PROPERTY, AT BACK OF THE SIDEWALKS, IF |
| NOT ALREADY INTALLED. PLEASE SHOW THE |
| LOCATIONS AND CONNECTION TO ALL THE CITY |
| SERVICES. |
| J. ALL OFF STREET PARKING STALLS MUST BE |
| PAINTED WITH DOUBLE 4" WIDE PAINT. |
| K. CITY STANDARDS MAY BE OBTAINED FROM |
| PUBLIC UTILITIES ENGINEERING SERVICES |
| DEPARTMENT, MR. MANNY GONZALEZ, 659-8040 |
| |
| IF ANY QUESTIONS PLEASE CONTACT 659-8096 |
| EXT. 8492 MOHAMMAD R. AMINI |