Date |
Text |
2003-02-06 00:00:00 | ************** UNSAT *************** |
| |
| PLEASE NOTE, SOME NOTES FROM |
| FIRST REVIEW STILL NEED TO BE ADDRESSED. |
| |
| 1)NOTE: PLEASE SEE OCP FOR AHU`S 1&2, |
| SHOWS 40A OCP FOR 10KW HEAT(MECH PLANS) |
| PLEASE ADJUST AQND CORRELATE MECH AND |
| ELECTRICAL PLANS. PLEASE ALSO SIZE OF |
| OCP PER 424-3 IF AHU'S ARE INDEED 10KW |
| AS SHOWN ON M SHEETS. PLEASE SEE LOADS |
| SHOWN ON PANEL SCHEDULE, LOAD SHOWN |
| EXCEEDS LOADS SHOWN ON LOAD CALCULATIONS |
| FOR CHILLER/COND UNITS. THE HIGHER OF |
| THE TWO LOADS NEED TO BE SHOWN IN LOAD |
| CALCS. PLEASE RE-DO LOAD CALCULATIONS |
| TO REFLECT LOADS OF AHU`S . SHOWN AT |
| 4.3 PER PHASE (CHILLERS AT 3.3 PER PHASE |
| )?? |
| |
| 2)NOTE: PLEASE SHOW ALL CONTINUOUS LOADS |
| AT 125%. 215-3,230-42 ETC. |
| |
| 3)NOTE: PLEASE PLACE NOTE ON E-2, |
| "NO HAZARDOUS MATERIALS TO BE USED AND |
| DOES NOT MEET ANY LOCATIONS IN ART 500 |
| IN THE NEC". |
| |
| PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| REVIEW. IF THERE ARE ANY QUESTIONS, |
| PLEASE CALL. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| 561-659-8096 EXT 8372 |
| |
| |
| PLEASE SEE FIRE REVIEW COMMENTS THAT |
| WILL AFFECT ELECTRICAL PLANS. |