Date |
Text |
2002-10-01 00:00:00 | UNSAT |
| ~~~~~ |
| ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ |
| |
| PLEASE PROVIDE THE FOLLOWING |
| INFORMATION AND MAKE NECESSARY |
| CORRECTIONS ON PLANS. |
| |
| 1} PLEASE SHOW GROUNDING ELECTRODE |
| GOING TO BUILDING STEEL AND COLD WATER |
| PER 250-50. SIZE PER 250-66.THE NOTE ON |
| THE GROUNDING ELECTRODE SYSTEM IN |
| UNACCEPTABLE FOR REVIEW. PLEASE PROVIDE |
| DETAILS OF THE GES. |
| |
| 2} THE LOADCENTER PANEL SCHEDULE FOR |
| PANEL "L" INDICATES 12 SPACES,YET PANEL |
| "L" LOAD CALCULATION INDICATES MORE |
| LOADS NOT LISTED IN THE SCHEDULE.PLEASE |
| CORRELATE. |
| |
| 3} IT IS UNCLEAR WHAT THE PURPOSE OF THE |
| EXISTING METER FEEDING THE EXISTING 100 |
| AMP DISCONNECT IS.IF THE NEW METER IS |
| FEEDING THE NEW PANEL "L" WHAT IS THE |
| EXISTING DISCONNECT FEEDING? PLEASE |
| CLARIFY AND CORRELATE THE RISER |
| DIAGRAM, LOAD CALCS,NUMBER & LOCATION |
| OF PANELS,ETC. |
| |
| 4} ON THE RISER DIAGRAM IT APPEARS THAT |
| THE NEW METER IS BEING FED FROM THE OLD |
| METER,PLEASE CLARIFY.IF THERE IS ANOTHER |
| BUILDING BEING FED FROM THIS SERVICE, |
| SHOW GROUNDING AND DISCONNECTING MEANS |
| AT THAT LOCATION. |
| |
| 5} PLEASE SUBMIT AIC RATINGS FOR |
| ALL NEW EQUIPMENT BEING INSTALLED. |
| MAINS/PANELS/BREAKERS MUST BE RATED FOR |
| THE AVAILABLE FAULT CURRENT PER 110-9. |
| |
| |
| IF THERE ARE ANY QUESTIONS PLEASE CALL. |
| |
| BILL TROBAUGH |
| ELECTRICAL PLAN REVIEW |
| 561/659-8096 EXT. 8392 |