Date |
Text |
2003-01-21 00:00:00 | DENIED |
| REFERENCE: FBC-2001 PLUMBING |
| FBC-2001 CHAPTER 11 |
| |
| 1) FROM PREVIOUS REVIEW: SHOW BACKING |
| PER REQUIREMENT #6. |
| 2) FROM PREVIOUS REVIEW: SHT P-1 PLUMB- |
| ING NOTES #7, AIR CHAMBERS ARE NOT APP- |
| ROVED. PLEASE DELETE REFERENCE. |
| 3) FROM PREVIOUS REVIEW: SHT P-5 (NEW |
| SHEET) SHOW REQUIRED WATER HAMMER ARRES- |
| TORS PER SECTION 604.9. LOCATION TO BE |
| NEAR THE FIXTURES IN AN "EFFECTIVE |
| RANGE" NOT AT THE TOP OF THE DROPS IN |
| THE CEILING. PER PDI-WH 201 AND MANUF. |
| INSTALLATION INSTRUCTIONS. |
| 4) FROM PREVIOUS REVIEW: SHT P-6 1/2 |
| AREA OF VERTICAL WALLS NOT SHOWN IN |
| CALCULATIONS AS REQUESTED. ALSO SHOW |
| AREA BEING DRAINED AT EACH ROOF DRAIN. |
| STORM WATER SHALL NOT DRAIN INTO THE |
| SANITARY SYSTEM, BUT SHALL DRAIN INTO |
| A CATCH BASIN OR STORM DRAIN ON SITE. |
| PLEASE SHOW ALL HORIZONTAL STORM PIPING |
| IN THE BLDG. AND SHOW ACCUMULATED SQUARE |
| FOOTAGE AT EACH STORM RISER. |
| 5) SHT P-6 STORM RISER WITH 3 DRAINS |
| SHOWS PIPING STARTING AT 4" AND THEN |
| REDUCING TO 3" AS IT PICKS UP THE 2ND |
| ROOF DRAIN. PLEASE CLAIRFY. |
| 6) FROM PREVIOUS REVIEW: PLEASE SUBMIT |
| A CONDENSATE RISER DIAGRAM. CONDENSATE |
| SHALL BE PIPED SAPARATELY OUT OF BDLG. |
| AND TIE INTO STORM, CATCH BASIN, OR DRY- |
| WELL. A RELIEF VENT IS REQUIRED AS COND. |
| EXITS BLDG. |
| 7) FROM PREVIOUS REVIEW: PLEASE SUBMIT |
| RISERS FOR RELIEF VALVE DISCHARGE AND |
| FOREMERGENCY PAN DRAIN LINES. SECTIONS |
| 504.7.1 & 504.8.1. - T/P LINES SHALL NOT |
| BE TRAPPED. INDICATE MATERIAL USED FOR |
| RISERS. |
| 8) FROM PREVIOUS REVIEW: PROVIDE A WATER |
| HEATER DETAIL SHOWING COMPLIANCE WITH |
| SECTION 607.3 THERMAL EXPANSION CONTROL. |
| ALSO SEE SECIION 607.3.2. |
| 9) FROM PREVIOUS REVIEW: SHT P-4 PLEASE |
| SHOW DRAINAGE FIXTURE UNITS AS THEY |
| ACCUMULATE IN THE SYSTEM IN THE HORIZON- |
| TAL DRAIN. |
| |
| REVIEW BY KEN STEVENS |
| (561) 659-8096 EXT. 8377 |