Date |
Text |
2002-08-30 00:00:00 | THE LAND DESIGN SOUTH PLANS ARE REQUIRED | | TO BE SIGNED SEALED AND DATED.SEE | | FBC 104.2.2. | | | | SHOW THE ATTIC ACCESS REQUIRED BY FBC | | 2309.6 | | | | SHOW THE ATTIC VENTILATION REQUIRED BY | | FBC 2309.7 INCLUDE THE FREE AREA OF ANY | | SCREENED VENT TO BE USED. | | | | SHEET 3 OF 3 "DESIGN CHART" DECLARES | | ROOF ONLY, WHAT WAS USED FOR THE REST | | OF THE BUILDING?INCLUDE COMPONENTS | | AND CLADDING FOR THE WALLS. | | | | SEE FBC 104.2.1.1 FOR THE ROOF COVERING | | DESIGN INFORMATION TO BE PLACED ON THE | | PLANS. | | | | HOW WAS THE 0.18 +/- INTERNAL PRESSURE | | COEFFICIENT DETERMINED?SEE FBC | | 1606.1.4.2 FOR ENCLOSED BUILDING | | CRITERIA. | | | | SHEET 3 OF3 CALLS OUT A "USP DTC" | | CONNECTOR FOR THE TRUSSES.USP DOES | | NOT LIST A "DTC" CONNECTOR IN THEIR | | CATALOG.WHAT IS INTENDED TO BE USED? | | | | WHAT GROUT SPECIFICATION AND VARIOUS | | OTHER SIGNIFICANT DESIGN CRITERIA ARE | | TO BE USED FOR THE FILLED CELL MASONRY? | | SEE FBC 2103.1. |
|