2002-09-13 00:00:00 | CHECKLIST: |
| 1-NEED RECORDED NOTICE OF COMMENCEMENT. |
| 2-PROVIDE ENGINEERING ANALYSIS/CALCS |
| SHOWING HOW THE MAIN WIND FORCE RESIS- |
| TING SYSTEM (MWFRS) WAS DESIGNED TO |
| TRANSFER LOADS THRU FLOOR AND CEILING |
| DIAPHRAGMS CONSIDERING THE DOUBLE |
| CEILING AREA AND THE PARTIAL FL. DIA- |
| PHRAGM SUPPORTED ON WOOD COLUMNS WITH |
| CONNECTORS (TOP AND BOTTOM) THAT DON'T |
| PROVIDE SUPPORT FOR LATERAL FORCES. |
| SEE SEC. 1606.2.4 FBC 2001. |
| 3-PROVIDE ENGINEERING ANALYSIS/CALCS |
| SHOWING MASONRY WALLS LATERAL STABILI- |
| TY (SEE SEC. 2105 FBC 2001) AND LATE- |
| RAL SUPPORT (SEE SEC. 2107 FBC 2001) |
| CONSIDERING THE HIGH VOLUME AREA AND |
| SINGLE BOND BEAM ONLY. |
| SEC. 104.2.1.2 CITY AMENDMENTS TO FBC. |
| 4-A)PROVIDE FIREBLOCKING AT STAIRS. IN- |
| CLUDING TOP AREA. SEC. 2305.1.4 FBC. |
| B)SPECIFY FIREBLOCKING AT ALL WALL SEC- |
| TIONS AND PROVIDE GENERAL SPECS FOR |
| REQUIRED FIREBLOCKING AT ALL CONCEALED |
| SPACES. SEC. 2305.1.4 FBC 2001. |
| 5-PROVIDE COMPLETE/CORRECT INFORMATION |
| FOR STORM SHUTTERS OR APPLY FOR SEPARA |
| TE PERMIT. SEE CITY IMPLEMENTATION |
| STANDARD FOR HURRICANE MISSILE IMPACT |
| PROTECTION. |
| **NOTE: SEE LIMITATIONS ON PRODUCT |
| APPROVAL SUBMITTED. |
| 6-PROVIDE DETAIL/SPECS FOR ONE HR FIRE |
| RATED WALL ASSEMBLY @ FRAMED WALL AREA |
| ABOVE BOND BEAM AT ZERO LOT LINE WALL |
| AS REQ'DBY TABLE 600 FBC 2001. |
| 7-PROVIDE 2X STRUCTURAL BUCK DETAIL FOR |
| ARCHED WINDOWS AT FRAMED AREA. |
| **NOTE; NEED SPECS FOR ATTACHMENT TO |
| MASONRY WALL AS WELL. SEE EXT. ELEV. |
| SEC. 104.2.1.2 CITY AMENDMENTS TO FBC. |
| 8-NOTE #2 ON A-1 CALL FOR WINDOW TO BE |
| RECESSED TO ALLOW FOR STORM SHUTTERS |
| INSTALLATION. PROVIDE COMPLETE STRUCT- |
| URAL DETAIL/SPECS. SECTION 104.2.1.2 |
| CITY AMENDMENTS TO FBC 2001. |
| **NOTE: SEE PRODUCT APPROVAL FOR TRACK |
| AND MOUNTING CONDITIONS CONSIDERING |
| THE GLASS DISTANCE & THE EDGE DISTANCE |
| 9-SEE PRODUCT APPROVAL FOR GARAGE DOOR |
| STRUCTURAL BUCK REQUIREMENTS & PROVIDE |
| DETAIL AS REQUIRED. SPECIFY ANCHOR |
| SIZE AND REQUIRED WASHER. SECTION |
| 104.2.1.2 CITY AMENDMENTS TO FBC 2001. |
| 10-SPECIFY FIRECUT REQUIREMENTS ON THE |
| STRUCTURAL WALL SECTIONS. SEC. 2305.4 |
| 11-STAIR FLOOR PALN: CLARIFY NOTE #13. |
| THERE IS NOT POST WHERE ARROW IS POIN- |
| TING. SEE PLAN ON SHEET A-5. |
| 12-IF WOOD COLUMNS ARE CHANGED TO STEEL, |
| THEN UPDATE STAIR FRAMIN DETAILS. |
| 13-SPECIFY SPACING FOR WWM IN CONCRETE |
| SLAB. SEE SEC. 1909.3 FBC 2001. |
| 14-SHEET S-1:A)SOME INFORMATION IS OVER- |
| LAPPING. B)COLUMN F6 DOESN'T MATCH |
| SCHEDULE. |
| 15-IDENTIFY ROOF ZONES IN ROOF FRAMING |
| PLAN. TABLE 2306.1 CITY AMENDMENTS. |
| 16-REVISE TRUSS CONNECTOR TO MATCH USP |
| PUBLISHED VALUES. PROVIDE ENGINEERING |
| CALCS FOR DIFFERENT VALUES. |
| SEC. 104.2.1.2 CITY AMENDMENTS TO FBC. |
| 17-PROVIDE ATTIC ACCESS ABOVE GARAGE AND |
| MORNING ROOM IF CLEAR HEIGHT IS MORE |
| THAN 24". SEE SEC. 2309.6 FBC 2001. |
| 18-24SH AND 34SH WINDOWS DON'T PROVIDE |
| MIN. CLEAR HEIGHT REQ'D FOR EGRESS. |
| SEE SEC. 1005.4.4 FBC 2001. |
| **NOTE: MAKE SURE THAT WINDOWS ON 2ND. |
| FL. WIL HAVE 5.7 S.F. MIN. CLEAR OP'G. |
| 19-UPDATE SHEET C-1. FOUNDATION NOTE |
| STILL CALLS FOR 0.004 MIL VISQUEEN. |
| NEED 0.006 MIL MIN. SEC. 1909.2 FBC. |
| 20-SHEET A-1: WHERE IS SEC/5 SHOWN ON |
| FLOOR PLAN BY GARAGE ENTRY. |
| 21-REVISE SIZE OF ATTIC ACCESS. 36" MIN. |
| SEC. 2309.6 FBC 2001. |
| 22-SHEET A-2: UPDATE GENERAL NOTE FOR |
| PLUMBING. REFERENCE FPC 2001. |
| 23-SHEET A-3: A)SOME INFORMATION IS OVER |
| LAPPING. SEE FRONT ELEVATION. B)REVISE |
| NOTE #4 FOR FRAMING AT ARCHED OPENINGS |
| AND FOR ONE HOUR FIRE RATED WALL AT |
| ZERO LOT LINE WALL. |
| 24-SHEET A-5: A)STAIRS CALCULATIONS ARE |
| NOT CLEAR. B)UPDATE SEMCO STRAP. C) |
| HANDRAIL DIMENSION IS NOT CLEAR. OVER- |
| LAPPING INFORMATION. D)KEY NOTE #14: |
| DRAFTSTOPPING IS NOT THE SAME AS FIRE- |
| BLOCKING. SEE SEC. 2305.1.4 FBC 2001. |
| ALSO, FIREBLOCKING SHOWN AT THE MIDDLE |
| OF STAIRS IS INCORRECT. IT DOESN'T |
| PROVIDE ANY FIREBLOCKING THE WAY IT'S |
| SHOWN. |
| 25-SHEET S-1:A)WHERE IS SEC/5?. B)IF |
| USING WOOD COLUMN, THEN REMEMBER TO |
| UPDATE SEMCO CONNECTORS. C)WHERE IS |
| COLUMN P3 SPECIFIED ON 2ND FL FRAMING? |
| 26-SHEET S-2: A)REVISE SEMCO CONNECTORS |
| SPECIFIED ON SECTION 5. B)SPECIFY |
| DRAFTSTOPPING LOCATION AND MATERIAL. |
| SEE SEC. 2305.2.2 FBC 2001. C)PROVIDE |
| SECTION/DETAIL SHOWING HOW IS BEAM |
| 2B-1 ANCHORED TO THE MASONRY COLUMNS |
| AT THE ENDS. SEC. 104.2.1.2 CITY AMEND |
| MENTS TO FBC 2001.*SAME PPLIES TO BEAM |
| AT MORNING ROOM AREA. D)CLARIFY SECT'N |
| #2: BB WITH 1 #7 OR BB WITH 1#5?. |
| E)FLOOR PLAN SHALL BE CALLED SECOND |
| FLOOR FRAMING PLAN, NOT GROUND FLOOR. |
| PLAN. |