2002-09-06 00:00:00 | CHECKLIST: |
| 1-NEED RECORDED NOTICE OF COMMENCEMENT. |
| 2-A)SPECIFY FIREBLOCKING MATERIAL AND |
| LOCATION @ STAIRS. INCLUDING TOP OF |
| STAIRS. SEE SEC. 2305.1.4 FBC 2001. |
| B)PROVIDE GENERAL SPECS FOR REQUIRED |
| FIREBLOCKING AT ALL CONCEALED SPACES. |
| SEE SEC. 2305.1.4 FBC 2001. |
| 3-DRAFSTOPPING TO BE LOCATED FOR AREAS |
| NOT TO EXCEED 500 S.F. REVISE AS REQ'D |
| SEE SEC. 2305.2.2 FBC 2001. |
| 4-SPECIFY FIRECUT REQUIREMENTS ON THE |
| STRUCTURAL WALL SECTIONS. SEE SEC. |
| 2305.4 FBC 2001. |
| 5-SPECIFY SUPPORTS AND SPACING FOR WWM |
| IN CONCRETE SLAB. SEE SEC. 1909.3 FBC. |
| 6-PROVIDE COMPLETE/CORRECT INFORMATION |
| FOR STORM SHUTTERS OR APPLY FOR A |
| SEPARATE PERMIT. CITY IMPLEMENTATION |
| STANDARD FOR HURRICANE MISSILE IMPACT |
| PROTECTION |
| 7-PROVIDE UPDATED PRODUCT APPROVALS FOR |
| ALL EXTERIOR DOORS, WINDOWS AND WINDOW |
| MULLIONS TO BE USED. |
| 8-REVISE STAIR KEY NOTE #1. HEIGHT OF |
| STAIR HANDRAIL TO BE BET. 34" AND 38". |
| SEE SECTION 1007.5.1 FBC 2001. |
| 9-2ND FLOOR FRAMING PLAN: |
| PROVIDE DETAIL SHOWING HOW DOES USP |
| HL210 WHICH IS A LIGHT GAUGE PURLING |
| HANGER IS USED TO HOLD GIRDER TRUSSES. |
| 10-SECTION 4/S3 IS CALLED 5/S3 ON ROOF |
| FRAMING PLAN. CLARIFY/REVISE AS REQ'D. |
| 11-REVISE DETAIL 4/S3 TO SHOW GABLE |
| END. ***NOTE: GABLE END TO BE DESIGNED |
| AS PER SEC. 2117 FBC 2001. PROVIDE |
| DETAIL WITH COMPLETE SPECS AND SPECIFY |
| ALL FASTENERS. |
| 12-REVISE TRUSS CONNECTOR SCHEDULE TO |
| MATCH USP PUBLISHED LOADS. |
| **NOTE: PROVIDE ENGINEERING CALCS FOR |
| LOADS OTHER THAN THE ONES SPECIFIED ON |
| USP. |
| **REMAINDER: 10D NAILS NEED 1 3/4" MIN. |
| PENETRATION TO GET FULL VALUE. |
| DON'T MISMATCH NAIL SIZE & LOADS. |
| 13-THERE IS NOT CONNECTOR SPECIFIED FOR |
| ROOF TRUSS WITH CALCULATED UPLIFT LOAD |
| OF 2537#. |
| 14-CONNECTOR T-5 DOESN'T RESIST THE |
| UPLIFT LOAD OF 2369# CALCULATED FOR |
| THE ROOF GIRDER TRUSS. REVISE AS REQ'D |
| 15-ROOF SHEATHING & NAILING NOTE ON DWG |
| S3 AND SECTION 4/S3 AND DIAPHRAGM |
| SCHEDULE HAVE DIFFERENT SPECS. REVISE/ |
| CLARIFY AS REQUIRED. |
| **NOTE: KEEP IN MIND THAT MEAN ROOF HT |
| BET. 25' AND 35' REQUIRES 8D RING |
| SHANK NAILS MIN. SEE TABLE 2306.1 CITY |
| AMENDMENTS TO FBC 2001. |
| 16-IDENTIFY NAILING ZONES IN ROOF FRAM'G |
| PLAN. TABLE 2306.1 CITY AMENDMENTS. |
| 17-DESIGN PRESSURES FOR ENTRY DOORS ARE |
| DIFFERENT ON THE FLOOR PLAN AND EXT. |
| ELEVATION. REVISE AS REQUIRED. |
| 18-SEE GARAGE DOOR PRODUCT APPROVAL FOR |
| STRUCTURAL BUCK SPECS & REVISE DETAIL |
| AS REQUIRED. |
| **NOTE: SPECIFY SIZE OF WASHERS. |
| 19-PROVIDE STRUCTURAL BUCK DETAIL FOR |
| INSTALLATION OF DOUBLE 2X BUCK TO |
| ACCOMMODATE THE ENTRY DOORS. SECTION |
| 104.2.1.2 CITY AMENDMENTS TO FBC 2001. |
| 20-UPDATE DRAWING C-1. FOUNDATION NOTE |
| STILL CALLS FOR 0.004 MIL VISQUEEN. |
| NEED 0.006 MIL. SEC. 1909.2 FBC 2001. |
| 21-UPDATE NOTE #3 ON SHEET S3. REFERENCE |
| FBC 2001 OR ASCE 7-98, NOT ASCE 7-93. |
| 22-SHEET A4: EXTERIOR ELEVATIONS ARE NOT |
| SHOWN AT 1/4" SCALE. REVISE AS REQ'D. |
| 23-SHEET A-2: UPDATE PLUMBING NOTE #6. |
| REFERENCE FPC 2001, NOT SPC 1994. |
| 24-SHEET A-7: A)SECT'NA/A6 TO BE SEC. |
| A/A7. REVISE AS REQUIRED |
| B)SPECIFY FIREBLOCKING ON SECTION A/A7. |
| SEC. 2305.1.4 FBC 2001. |