2002-08-26 00:00:00 | CHECKLIST: |
| 1-PROVIDE ENGINEERING ANALYSIS/CALCS FOR |
| CLARIFICATION OF HOW THE MAIN WIND |
| FORCE RESISTING SYSTEM (MWFRS) WAS |
| DESIGNED TO RESIST AND TRANSFER ALL |
| LOADS THRU FLOOR & CEILING DIAPHRAGMS |
| CONSIDERING THE DUOBLE CEILING AREA & |
| THE PARTIAL FLOOR DIAPHRAGM ANCHORED |
| TO WOOD COLUMNS. SEE SEC. 1606.2.4 FBC |
| **NOTE: TOP & BOTTOM CONNECTORS AT WOOD |
| COLS. DO NOT TRANSFER LATERAL LOADS. |
| SEE USP CATALOGUE. |
| 2-PROVIDE SOIL TEST REPORT. |
| 3-PROVIDE COMPLETE/CORRECT INFORMATION |
| FOR STORM PANELS OR APPLY FOR SEPARATE |
| PERMIT. CITY IMPLEMENTATION STANDARD |
| FOR HURRICANE MISSILE IMPACT PROTECT'N |
| 4-PROVIDE PRODUCT APPROVAL FOR SINGLE |
| HUNG WINDOWS, SLIDING GLASS DOORS AND |
| WINDOW MULLIONS. |
| **NOTE: PROVIDE MORE LEGIBLE PRODUCT |
| APPROVAL FOR GARAGE DOORS AND ENTRY |
| DOORS FOR FUTURE SUBMITTALS. |
| 5-SPECIFY FIREBLOCKING MATERIAL AND |
| LOCATION AT STAIRS. SEE SEC. 2305.1.4 |
| **NOTE: PROVIDE GENERAL SPECIFICATIONS |
| FOR FIREBLOCKING AT ALL CONCEALED |
| SPACES. SEC. 2305.1.4 FBC 2001. |
| 6-REVISE FOUNDATION NOTE #1 SHEET C-1. |
| NEED 6 MIL MIN. VISQUEEN. SEC. 1909.2 |
| 7-PROVIDE SAFETY GLASS IN WINDOW @ FIRST |
| FLOOR BATHRM. SEC. 2405.2 FBC 2001. |
| 8-MISSING SHEET A-6 WITH ALL DETAILS/ |
| SECTIONS SPECIFIED ON PLANS. |
| 9-PROVIDE STRUCTURAL DETAIL FOR RECESSED |
| WINDOWS TO ALLOW FOR STORM SHUTTERS |
| INSTALLATION. SEE PRODUCT APPROVAL FOR |
| TRACK TO BE USED AND CONSIDER THE MIN. |
| EDGE DISTANCE FOR ANCHORS AND GLASS |
| SEPARATION. SEC. 104.2.1.2 CITY |
| AMENDMENTS TO FBC 2001. |
| 10-24SH WINDOW AT MASTER BEDROOM DOESN'T |
| ALLOW 24" MIN. CLEAR HT OPENING. ALSO, |
| NEED TO HAVE 5.7 S.F. MIN. TOTAL CLEAR |
| OPENING. SEE SEC. 1005.4.4 FBC 2001. |
| 11-CHANGE NOTE #1 ON STAIRS KEYNOTES. |
| HEIGHT OF HANDRAIL TO BE BET. 34" AND |
| 38" MAX. SEE SEC. 107.5.1 FBC 2001. |
| 12-SHEET A-7: A)SOME INFORMATION IS OVER |
| LAPPING. EG AT RISER SPECS. |
| B)NOTE #9: REVISE SIZE OF LEDGER. SEE |
| 2ND FL. FRAMING PLAN. ALSO, SEE FRAM'G |
| PLAN FOR ORIENTATION OF FLOOR TRUSSES |
| AND REVISE DETAIL 2/A7 AS REQUIRED. |
| 13-SHEET S-1: A)CLARIFY REINFORCING |
| SPECIFIED FOR FOOTING F5530. |
| B)SWITHLINTELS L-9 AND L-17 TO MATCH |
| OPENINGS. |
| C)WHERE ARE DETAILS KEYED FOR SHEET A-6? |
| 14-PROVIDE FIRECUT REQUIREMENTS ON THE |
| STRUCTURAL WALL SECTIONS. SEC. 2305.4 |
| 15-REVISE TRUSS CONNECTOR TO MATCH USP. |
| SPECS. PROVIDE ENGINEERING CALCS FOR |
| UPLIFT VALUES DIFFERENT THAN USP. |
| 16-SHEET S-2: SECTION 1 AND SECTION 2 |
| HAVE DIFFERENT SPECS FOR CONNECTORS. |
| CLARIFY/REVISE AS REQUIRED. |
| 17-ROOF SHEATHING & NAILING STATEMENT & |
| DIAPHRAGM SCHEDULE HAVE DIFFERENT |
| SPECS AS WELL. CLARIFY/REVISE AS REQ'D |
| **IDENTIFY ROOF NAILING ZONES IN ROOF |
| FRAMING PLAN. |
| 18-SPECIFY CONNECTORS FOR GIRDER TRUSS |
| AT GARAGE ROOF FRAMING PLAN. |
| 19-ENERGY CALCULATIONS: |
| A)A/C AREA DOESN'T MATCH PLANS. |
| B)THERE IS NOT ADJACENT WOOD FRAMING. IT |
| IS ADJACENT MASONRY. |
| C)OWNER/AGENT TO SIGN BOTTOM OF FORM TOO |
| 20-SEE PRODUCT APPROVAL FOR WINDOW |
| MULLION AND PROVIDE DETAIL/SPECS FOR |
| BUCK ATTACHMENT. |
| 21-SEE GARAGE DOOR PRODUCT APPROVALS FOR |
| STRUCTURAL BUCK REQUIREMENTS & REVISE |
| DETAIL AS REQUIRED. |