2002-08-29 00:00:00 | BUILDING PLAN REVIEW |
| *******DENIED******* |
| |
| 1) STRUCTURE IS LOCATED IN AN "AO" FLOOD |
| ZONE AN ELEVATION CERTIFICATE WILL BE |
| REQUIRED. |
| |
| 2) PROVIDE A DETAIL INDICATING HOW A/C |
| EQUIPMENT WILL BE SUSPENDED FROM THE |
| TRUSSES. THIS INFORMATION IS ALSO TO BE |
| PROVIDED TO THE TRUSS ENGINEER. |
| |
| 3)PROVIDE (2) CURRENT AND COMPLETE |
| COPIES OF SBCCI OR METRO-DADE PRODUCT |
| APPROVALS FOR: |
| - ARCHED TOP FIXED GLASS WINDOW SHOWN ON |
| PLANS AT BEDROOM #3. |
| - STORM PANELS (PRODUCT APPROVAL WAS NOT |
| WITH THE KEY PLAN AND INSTALLATION |
| SCHEDULE) |
| |
| 4) NO UPLIFT VALUES OR TRUSS ANCHORS ARE |
| SPECIFIED ON THE ROOF FRAMING PLAN ON |
| 3A. THE ANCHORAGE SCHEDULE ON 3A |
| SPECIFIES THAT CONNECTORS B OR F BE USED |
| UNLESS OTHERWISE NOTED. PLEASE CLARIFY |
| IF THESE CONNECTORS WILL BE ADEQUATE TO |
| RESIST ALL LOADS. |
| |
| 5) THE LINTEL OVER THE SLIDING GLASS |
| DOOR AT THE LIVING ROOM IS NOT SHOWN ON |
| THE ROOF FRAMING PLAN ON 3A. PLEASE |
| PROVIDE A PRECAST LINTEL SCHEDULE FOR |
| LINTELS THAT ARE BEING USED. |
| |
| 6) THE COVERED ENTRY DETAIL ON 3A SHOWS |
| THE TRUSSES SITTING ON THE CONCRETE |
| BETWEEN THE 2X8 PLATES. ARE THE PLATES |
| CONTINOUS WITH THE TRUSSES SITTING ON |
| TOP OF THEM? PLEASE CLARIFY. |
| |
| 7) PROVIDE A DETAIL OF THE INTERIOR WOOD |
| FRAME BEARING WALLS. INDICATE ANCHORS, |
| CONNECTORS, ETC. |
| |
| ROBERT MCDOUGAL |
| BLDG. PLAN REVIEW |
| (561)659-8096 EXT.8202 |