Plan Review Notes
Plan Review Notes For Permit 02080203
Permit Number 02080203
Review Stop R
Sequence Number 1
Notes
Date Text
2002-08-27 00:00:00************BUILDING PROVISO************
  
 1) STRUCTURE IS LOCATED IN AN 'AO' FLOOD
 ZONE AN ELEVATION CERTIFICATE IS
 REQUIRED.
  
 2) NO UPLIFT OR CONNECTORS ARE INDICATED
 ON THE ROOF FRAMING PLAN ON SHEET 3A.
 THE ANCHOR SCHEDULE SPECIFIES CONNECTORS
 TO BE USED UNLESS OTHERWISE NOTED ON THE
 FRAMING PLAN. IF THE REACTION VALUES
 GIVEN ON THE TRUSS DRAWINGS EXCEED THE
 CONNECTOR VALUES LISTED IN THE SCHEDULE,
 A REVISED ROOF FRAMING PLAN WILL BE
 REQUIRED.
  
 3)PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - ARCHED TOP FIXED GLASS WINDOW AS SHOWN
 ON REAR ELEVATION.
 - STORM PANELS(THE KEY PLAN AND INSTALL-
 ATION SCHEDULE DID NOT HAVE A PRODUCT
 APPROVAL WITH THEM)