Date |
Text |
2002-07-19 00:00:00 | PLUMBING PLAN REVIEW, DENIED |
| 1. SUBMIT AN ISOMETRIC DRAWING THAT |
| CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| AND CORRESPONDING LENGTHS PER STANDARD |
| GAS CODE. |
| 2. CLEARLY SHOW THE LOCATION AND CAP- |
| ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| OR ASME), THE DISTANCE OF THE TANK FROM |
| THE BUILDING AND ADJACENT PROPERTY LINES |
| THE DISTANCE OF THE TANK FROM ALL SOUR- |
| CES OF IGNITION, OTHER CONTAINERS, BUILD |
| INGS, AND THE LOCATION OF ANY BUILDING |
| OPENINGS BELOW THE RELIEF VALVE OF THE |
| TANK PER NFPA 58, TABLE 3-2.2.2. |
| 3. SUBMIT A DETAIL SHOWING THE TYPE, |
| LOCATION, SIZE AND TERMINATION OF THE |
| GAS VENTS PER THE STANDARD GAS CODE SECS |
| 602 THRU 612. |
| 4. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| EQUIPMENT TO VERIFY COMPLIANCE WITH |
| STANDARDS NFPA 54, NFPA 58, AND THE |
| STANDARD GAS CODE SEC. 402. |
| LEGIBLE CUT SHEETS TO SHOW BTU'S. |
| 5.NFPA-58,SEC 3.2.2.6(H) TO PREVENT FLOT |
| ATION, UNDER GROUND TANKS SHALL BE |
| SECURLEY ANCHORED. |
| 6 NFPA-96 SEC 5.5.4 EMERGENCY HOOD SOV |
| TO BE BELOW CEILING, MANUAL SOV TO BE UP |
| STREAM, UNION TO BE DOWN STREAM OF THE |
| MANUAL SOV. |
| 8. SGC-97 SEC 104.2.3 PLANS TO BE SIGNED |
| AND SEALED BY ENGINEER OF RECORD |
| END OF COMMENTSPAUL SCHMITZ |
| QUESTIONS561-659-8096X8233 |