Date |
Text |
2002-08-23 00:00:00 | CHECKLIST: |
| 1-PROVIDE ENGINEERING ANALYSIS/CALCS FOR |
| EXTERIOR MASONRY WALL WITH VERTICAL |
| REINFORCEMENT AT 8'-0"O.C. TIED TO THE |
| BOND BEAM TO VERIFY FOR LATERAL STABI- |
| LITY (SEC. 2105 FBC 2001) AND LATERAL |
| SUPPORT (SEC. 2107 FBC). |
| 2-PROVIDE COMPLETE DETAILS AND SPECS FOR |
| CONSTRUCTION OF GABLE END TRUSSES AT |
| FRONT OF ELEVATION SHOWING HOW ARE THE |
| GABLE ENDS STRUCTURALLY CONTINUOUS. |
| SEE SEC. 2313.4 FBC 2001. |
| **NOTE: CLARIFY WHY BLOCKING AT FRONT |
| GABLE ENDS IS SHOWN ONLY PARTIALLY |
| AND NOT ALL THE WAY TO THE ENDS OF |
| GABLE ENDS. SEC. 104.2.1.2 CITY |
| AMENDMENTS TO FBC 2001. |
| 3-NEED RECORDED NOTICE OF COMMENCEMENT. |
| 4-DWG C-1: REVISE NOTE #1. NEED 0.006 |
| MIL VISQEEN MIN. SEC. 1909.2 FBC 2001. |
| 5-SPECIFY INTERNAL PRESSURE COEFFICIENT |
| AS REQ'D BY SEC. 1606.1.7 FBC 2001. |
| 6-SHEET A-1: UPDATE GENERAL NOTE #6. |
| USE FPC 2001. |
| 7-THERE IS NOT SECTION A/A-3. IT SHOULD |
| BE SECTION B/A-3. REVISE AS REQUIRED. |
| 8-PROVIDE SOIL TEST REPORT. |
| 9-WINDOW (E) IN BATHROOM #2 TO BE SAFETY |
| GLASS. SEC. 2405.2.1 FBC 2001. |
| 10-SHEET A-4: REVISE FOOTING DIMENSIONS |
| TO MATCH FOUNDATION PLAN. |
| 11-SHEET S-1: STRUCTURAL NOTE #1 CALLS |
| FOR 2000PSF. SOIL STATEMENT CALLS FOR |
| 2500 PSF SOIL BEAR'G CAPACITY. CLARIFY |
| 12-SHEET S-3: A)REVISE/UPDATE NOTE #3 |
| TO FBC 2001 FOR 140MPH. |
| B)NOTE#3: SEMCO IS OUT OF BUSINESS. |
| REVISE STRAP RTPGA820. |
| 13-SHEET S-2: DETAIL A/S-2.1 TO READ |
| A/S-2. THERE IS NOT S-2.1 DWG. |
| 14-THERE IS NOT CONNECTOR DETAIL A/S2 AS |
| REFERENCED ON ROOF FRAMING PLAN. |
| 15-ENERGY CALCULATIONS: A)REVISE UNDER |
| ATTIC AREA. SEE SEC. 602.1ABC.1.2 OF |
| CHAPTER 13 FBC 2001. |
| B)OWNER/AGENT TO SIGN AND DATE BOTTOM |
| OF ENERGY CALCS FORM. |
| 16-PROVIDE ROOF AND WALL SHEATHING |
| SCHEDULE. TABLE 2306.1 CITY AMENDMENTS |
| TO FBC 2001. |
| **NOTE: IDENTIFY ROOF NAILING ZONES ON |
| ROOF PLAN. |
| 17-SPECIFY SUPPORTS AND SPACING FOR WWM |
| IN CONCRETE SLAB. SEE SEC. 1909.3 FBC. |
| 18-PROVIDE PRODUCT APPROVAL FOR DOORS, |
| WINDOWS AND WINDOW MULLIONS. |
| 19-PROVIDE COMPLETE/CORRECT INFORMATION |
| FOR STORM PANELS OR APPLY FOR SEPARATE |
| PERMIT AS REQUIRED BY CITY IMPLEMENTA- |
| TION STANDARD FOR HURRICANE MISSILE |
| IMPACT PROTECTION. |
| 20-SECTIONS 6 & 7 ON SHEET S-2: SPECIFY |
| ALL CONNECTORS AND CLARIFY IF TRUSSES |
| ARE BEARING ONM THE TOP OR BOTTOM |
| CHORD. SEC. 104.2.1.2 CITY AMENDMENTS. |
| 21-SHEET S-2: A)COLUMNS SPECIFIED ON |
| ELEVATION "A" DON'T MATCH FOUNDATION |
| PLAN. |
| B)WHERE IS SECTION 1/S2?. |
| 22-SHEET A-1: ATTIC ACCESS IS 36". SEE |
| SEC. 2309.6 FBC 2001. REVISE NOTE #7. |
| 23-PROVIDE STRUCTURAL BUCK DETAIL FOR |
| ARCHED WINDOW SHOWING 2X BUCK. |
| **NOTE: NEED DETAIL FOR MASONRY AND WOOD |
| FRAMING. SEE EXTERIOR ELEVATION. |
| 24-SHEET A-4: A)SPECIFY FIREBLOCKING ON |
| SECTION 1/A4. SEC. 2305.1.4 FBC 2001. |
| B)PROVIDE GENERAL SPECIFICATIONS FOR |
| FIREBLOCKING AT ALL CONCEALED SPACES |
| AS REQUIRED BY SEC. 2305.1.4 FBC 2001. |
| 25-SEE PRODUCT APPROVAL FOR GARAGE DOORS |
| FOR STRUCTURAL BUCK SPECIFICATIONS AND |
| REVISE DETAIL AS REQUIRED. |