2002-08-26 00:00:00 | ************BUILDING PROVISO************ |
| |
| 1)PROVIDE (2) CURRENT AND COMPLETE |
| COPIES OF SBCCI OR METRO-DADE PRODUCT |
| APPROVALS FOR: |
| - ARCHED TOP FIXED GLASS WINDOWS AS |
| SHOWN ON ARCHITECTURAL DRAWINGS |
| |
| 2) PROVIDE A SOIL BEARING CAPACITY TEST |
| REPORT SIGNED AND SEALED BY ENGINEER, |
| PRIOR TO FIRST INSPECTION. |
| |
| 3) PROVIDE MANUFACTURER'S SPECIFICATIONS |
| AND UL LISTING FOR GLASS BLOCK WHICH |
| INDICATES A ONE HOUR FIRE RATING. |
| |
| 4) PROVIDE (2) PRODUCT APPROVALS, KEY |
| PLANS AND INSTALLATION SCHEDULES |
| INDICATING THE SPECIFIC TYPES OF ANCHORS |
| TO BE USED FOR STORM PANELS. A SEPARATE |
| PERMIT WITH ADDITIONAL FEES IS REQUIRED. |
| |
| 5) PLEASE INDICATE THE INTERNAL PRESSURE |
| COEFFICIENT ON THE PLANS FOR FUTURE |
| SUBMITTALS. IT IS + OR - .18 FOR |
| ENCLOSED STRUCTURES. |
| |
| 6) PLEASE CORRECT THE ROOF SHEATHING |
| NAIL SPACING LISTED ON SHEETS GN-1, S-2 |
| AND S-3 OF THE PLANS FOR FUTURE |
| SUBMITTALS. IT IS 6"O.C.INTERMEDIATE AND |
| 6"O.C.EDGES IN ZONES 1&2 AND 6"O.C. |
| INTERMEDIATE AND 4"O.C. EDGES IN ZONE 3. |
| SEE CITY AMENDMENTS TO FBC TABLE 2306.1. |