2002-10-30 00:00:00 | SUBMITTAL CHECKLIST: |
| 1-PROVIDE SOIL TEST REPORT. |
| 2-STORM SHUTTERS: A)CLARIFY DESIGN PRE- |
| SSURES. SEE ARCHITECTURAL DWGS. NOTE: |
| DESIGN PRESSURES LIMITS THE MAX. SPAN |
| OF PANELS. B)CLEARLY INDICATE ON DWGS |
| ANCHOR TYPE AND SPACING TO BE USED IN |
| THIS PROJECT. C)CLARIFY IF USING RAWL |
| OR CAULK-IN ANCHORS. D)PROVIDE COMPLE- |
| TE SBCCI PRODUCT APPROVAL REPORT. |
| 3-ARCHITECT TO CLARIFY DESIGN PRESSURES |
| CALCULATED FOR ENTRY DOORS. SEE FLOOR |
| PLAN AND EXTERIOR ELEVATION. |
| 4-PROVIDE COMPLETE INFORMATION FOR |
| STRUCTURAL BUCK DETAIL AT GARAGE. |
| MISSING ANCHOR BOLT SIZE AND WASHER. |
| SEC. 104.2.1.2 CITY AMENDMENTS TO FBC. |
| 5-REVISED TRUSS ANCHOR SCHEDULE IS NOT |
| CORRECT. SEE USP CATALOGUE FOR NAIL |
| TYPE AND CORRESPONDING VALUES OR |
| PROVIDE ENGINEERING CALCULATIONS FOR |
| DIFFERENT VALUES. |
| 104.2.1.2 CITY AMENDMENTS TO FBC 2001. |
| 6-DETAIL 5/S3 IS NOT GOOD. CONNECTOR |
| HL210 IS A PURLIN HANGER. IT DOESN'T |
| RESIST THE CALCULATED LOADS AND IS NOT |
| INTENDED TO SUPPORT BEAMS. SEE USP |
| CATALOGUE AND 2ND FLOOR FRAMING PLAN. |
| REVISE CONNECTION AS REQUIRED. |
| 7-SPECIFY ROOF TRUSS CONNECTOR @ GIRDER |
| TRUSS WITH UPLIFT LOAD OF 2537#. |
| 8-REVISE CONNECTOR (2)TC-6 FOR THE OTHER |
| ROOF GIRDER TRUSS. USE VALUES OF RE- |
| REVISED TRUSS ANCHOR SCHEDULE. SEE USP |
| CATALOGUE. SEC. 104.2.1.2 CITY AMENDM/ |