Date |
Text |
2002-08-08 00:00:00 | CHECKLIST: |
| 1-PROVIDE ENGINEERING CALCULATIONS AND |
| DIAGRAMS SHOWING HOW ARE EXTERIOR |
| WALLS DESIGNED FOR LATERAL STABILITY |
| (SHEAR WALLS) SEC. 2105 FBC AND FOR |
| LATERAL SUPPORT AS REQUIRED ON SECTION |
| 2107 FBC. CLARIFY HOW ARE WIND LOADS |
| TRANSFERED TO THE ROOF AND FLOOR |
| DIAPHRAGMS. (SEC. 104.2.1.2 CITY |
| AMENDMENTS TO FBC 2001. |
| 2-CLARIFY CONNECTION AT POST P1. PROVIDE |
| CALCULATIONS SHOWING THAT CONNECTORS |
| (TOP AND BOTTOM) WILL RESIST THE LOADS |
| TRANSFERED FROM THE FLOOR DIAPHRAGM. |
| SEC. 104.2.1.2 CITY AMENDMENTS TO FBC |
| 3-CLARIFY COL. SCHEDULE. P1 IS 6X8 POST. |
| WHAT IS 4X10 W/ 2X10 NAILED TOGETHER? |
| ALSO, USP PA66 IS NOT GOOD FOR A 6X8 |
| POST. REVISE AS REQUIRED. |
| 4-NEED RECORDED NOTICE OF COMMENCEMENT. |
| 5-SPECIFY FIREBLOCKING AT TOP OF STAIRS. |
| SEC. 2305.2.2 FBC 2001. |
| NOTE: DRAW TOP & BOTTOM TRUSS CHORD TO |
| SCALE TO CLARIFY DETAIL. |
| 6-NEED SIGNED & SEALED SOIL TEST REPORT. |
| 7-STORM SHUTTERS: |
| A)DRAWINGS DON'T MATCH REPORT AND ARE |
| NOT LEGIBLE. |
| B)CHECK KEY PLAN AND INSTALLATION SCHED. |
| WITH ACTUAL PLANS SUBMITTED. |
| 8-PROVIDE PRODUCT APPROVAL FOR: |
| A)ENTRY DOORS W/ LEGIBLE REPORT & DWGS. |
| B)SINGLE HUNG WINDOWS FIRST PAGE OF |
| REPORT DOESN'T MATCH THE REST. |
| C)ARCHED WINDOWS. SEE SIZES SHOWN ON |
| PLANS. |
| 9-PROVIDE 2X STRUCTURAL BUCK DETAIL FOR |
| ARCHED WINDOWS AS REQUIRED BY PRODUCT |
| APPROVAL. NOTE DETAIL SUBMITTED IS NOT |
| CORRECT. SEE ARCHED OPENINGS. THERE IS |
| NOT FRAMED WALL. REVISE AS REQUIRED. |
| 10-SHEET C1 WAS NOT CHANGED. |
| 11-PROVIDE COMPLETE DETAILS & SPECS FOR |
| FRAMED WALLS SHOWING HOW ARE SHEAR |
| WALLS TRANSFERING THE LOADS. SEE SEC. |
| 2313 FBC 2001. |