2003-06-07 00:00:00 | DENIED |
| REFERENCE: FBC-2001 PLUMBING |
| FBC-2001 FUEL GAS |
| FBC-2001 BUILDING |
| FHA-AMEND 98 DESIGN MANUAL |
| |
| 1) FROM PREVIOUS REVIEW: SUBMIT CALCUL- |
| ATIONS FOR PRIMARY AND SECONDARY ROOF |
| DRAINS. INCLUDE 1/2 AREA OF ALL VERTICAL |
| WALLS, (INCLUDING PARAPETS), AND AREA OF |
| ROOFS THAT DRAIN DOWN FROM ABOVE. EACH |
| AREA IS AFFECTED BY VERTICAL WALLS, AND |
| SOME ARE AFFECTED BY ADDITIONAL AREA OF |
| ROOF THAT DRAIN FROM ABOVE, I.E. STAIR |
| ROOFS, MECHANICAL ROOM ROOFS, ECT. |
| PLEASE CALCULATE EACH AREA WITH ALL IN- |
| FORMATION REQUESTED INCLUDED. ALSO IN- |
| DICATE HOW INTERNAL AREAS OF THE ROOF, |
| (WITH OUT SCUPPERS), IMPACT AREAS AROUND |
| THEM AS FAR AS SIZING SCUPPERS. SHOW |
| CALCULATIONS FOR SIZING SCUPPERS IN |
| SURROUNDING AREAS. 1106/107 |
| 2) SHTS P-407, & P408 STORM WATER RISER |
| ISOMETRIC. SOME PIPE SIZING IS NOT CORR- |
| ECT. PIPE SIZED FOR VERTICAL RISER, BUT |
| HAS HORIZONTAL OFFSET THAT NEED TO BE |
| SIZED FOR HORIZONTAL. (SEE RED LINE |
| COMMENTS ON SHEETS). ALSO SEE PREVIOUS |
| COMMENT PRIOR TO ADJUSTING PIPE SIZE. |
| TABLE 1106.3 |
| 3) SHTS P409, & P410 SANITARY RISER DIA- |
| GRAM DOES NOT REFLECT THE FLOOR PLAN. |
| SOME PIPING IS NOT SIZED CORRECTLY. |
| SOME CLEANOUTS NOT SHOWN. RECHECK THE |
| FIXTURE UNIT ADDITION. TABLE 710.1(1) |
| 4) SHT P-202 STORM WATER PIPING DOES NOT |
| MATCH LEGEND SHT P-101. 104.2.1 |
| 5) SHT P-202 PLEASE INDICATE WHAT WILL |
| BE DRAINING INTO 6" H.D. IN POOL/MECH. |
| ROOM #C161. (POOL DRAIN/OVERFLOW TO STOR |
| M, AND WASTE FROM POOL TO SANITARY.) |
| SEC 104.2.1 |
| 6) SHT P-201 INDICATE TYPE OF BUSINESS |
| IN BISTRO SERVERY. WILL FOOD BE PREPARED |
| OR SERVED?SEC 104.2.1 |
| 7) SHT P-201 MENS TOILET ROOM, (C166), & |
| WOMENS TOILET ROOM, (C165). NO SANITARY |
| PIPING SHOWN FOR LAVS IN HDCP STALLS. |
| SECTION 104.2.1 |
| 8) SHT P-409 BLDG. DRAIN ISOMETRIC, |
| SHOWS BLDG. DRAIN "B" DRAINING INTO BLDG |
| DRAIN "D", FUT FLOOR PLAN SHT P-202 |
| SHOWS "B" DRAINING TO "F". PLEASE CLAIR- |
| FY.SEC 104.2.1 |
| 9) SHT P-203 NO SANITARY DRAINAGE PIPING |
| TO ICE BIN #130, AND WORK COUNTER SINK |
| #129. PLEASE CLAIRFY. SEC 104.2.1 |
| 10) SHT P-410 BLDG DRAIN ISO "G" IS NOT |
| COMPLETE. MISSING RISERS B/49, B/57, |
| B/51, B/52, KS/32, & KS/33. SEC 104.2.1 |
| 11) SHTS P-410, P-202, & P-203,CLEANOUTS |
| REQUIRED PER SECTION 708.3.3. PLEASE |
| SHOW ON FLOOR PLAN AND ISOMETRIC. |
| 12) SHTS P-409 & P-410, COMPLETE RISER |
| REQUIRED FOR 1ST FLOOR BLDG DRAIN. FOR |
| AN EXAMPLE BLDG DRAIN "H" SHOW ALL FIX- |
| TURES ON RISER DIAGRAM. SOME AREAS JUST |
| HAVE A LINE WITH FIXTURE UNITS BUT DO |
| NOT SHOW FIXTURES.SEC 104.2.1 |
| 13) SHT P-203 PLEASE INDICATE WHAT WILL |
| BE DRAINED INTO 4" H.D. IN COOLING TOWER |
| ENCLOSURE.SEC 104.2.1 |
| 14) SHT P-402 SANITARY RISER DIAGRAM |
| #B/9 DOES NOT REFLECT THE FLOOR PLAN. |
| PLEASE CLAIRFY.SEC 104.2.1 |
| 15) SHT P-403 RISERS B/17 & B/18 START |
| ON 1ST FLOOR SHT P-201, BUT DO NOT SHOW |
| UP ON SHT P-207, (B/17), SHT P-210, BOTH |
| SHT P-213, BOTH, AND SHT P-215, BOTH. |
| PLEASE CLAIRFY. SEC 104.2.1 |
| 16) SHT P-406 SANT RISER B/19 SHOWN ON |
| 1ST FLOOR OF SHT P-201 & P-207, BUT NOT |
| FOUND ON SHTS P-210, P-213, P-215, OR |
| P-217. FLOOR PLAN DOES NOT REFLECT THIS |
| RISER OR THE FIXTURES CALLED FOR ON THE |
| RESER. ALSO THERE IS ONLY A W/C SHOWN ON |
| THE THIRD FLOOR OF RISER. SEC 104.2.1 |
| 17) SHT P-406 RISER B/29 MISSING VENT |
| FOR 2ND FLOOR. SEC 104.2.1 |
| 18) SHT P-409 BLDG DRAIN ISOMETRIC DOES |
| NOT REFLECT THE FLOOR PLAN. ISO SHOWS |
| RISER W/10, AND FLOOR PLAN SHOWS B/19. |
| PLEASE CLAIRFY.SEC 104.2.1 |
| THE FOLLOWING ITEMS HAVE NOT BEEN |
| ADDRESSED. SEE ATTACHES SHEET REFERENC- |
| ING FLORIDA STATUTE 553.80(2)(B). THIS |
| WAS THE THIRD REVIEW. |
| 19) PLANS SHALL BE ROUTED TO THE PLAM |
| BEACH HEALTH UNIT. THIS SHALL BE DONE |
| PRIOR TO RESUBMITTING TO THE CITY FOR |
| REVIEW.SEC 101.4.7 |
| 20) SHTS A-2.41, A-2.42, & A-2.43. NO |
| MEASURMENTS FOR BACKING SHOWN ON PLANS. |
| (FHA DESIGN MANUAL REQUIREMENT #6) |
| SPECIFICATION "A" OR "B" HAS NOT BEEN |
| INDICATED. (FHA DESIGN MANUAL REQUIRE- |
| MENT 7B). W/C OPENINGS NOT SHOWN. (FHA |
| DISIGN MANUAL 7B. SEC 104.2.1 |
| 21) SHT A-8.11 TURNING CIRCLE NOT SHOWN |
| FOR PUBLIC AND COMMON USE TOILET/BATHING |
| ROOMS. 11-4.22.3SEC 104.2.1 |
| 22) SHT A-8.13 ELEVETIONS 8B, 8C, & 8D |
| DO NOT MATCH INDICATOR ON DETAIL #1 SHT |
| A-2.41SEC 104.2.1 |
| 23) THE PERSONAL SEAL, SIGNATURE AND THE |
| DATE OF THE ARCHITECT SHALL APPEAR ON |
| ALL ARCHITECTURAL DOCUMENTS TO BE FILED |
| FOR PUBLIC RECORD. NO DATES APPEAR ON |
| THE SEAL.61G1-16.003 |
| 24) SUBMIT MANUF SHEETS FOR ALL GAS |
| EQUIPMENT TO VERIFY COMPLIANCE WITH THE |
| FBC-2001 FUEL GAS CODE SEC 402.2. THE |
| WATER HEATER HEATER SHEETS WERE SUBMITT- |
| ED, BUT NOT THE REST OF THE EQUIPMENT. |
| *********WHEN RESUBMITTING PLANS******** |
| PLEASE CLEARLY INDICATE THE REVISION AND |
| REMOVE AND REPLACE ANY PAGES AS NECESS- |
| ARY. SUBMIT (1) SET OF OLD DRAWINGS WITH |
| THE PLANS WHEN RESUBMITTING PLANS. A |
| TRANSMITTAL LETTER LISTING THE ORIGINAL |
| REVIEW NUMBER, WITH A DESCRIPTION OF THE |
| REVISION MADE, IDENTIFYING THE SHEET OR |
| SPECIFICATION PAGE WHERE THE CHANGES CAN |
| BE FOUND, WILL HELP TO EXPEDITE YOUR |
| PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| REVIEW BY KEN STEVENS |
| (561) 659-8096 EXT 8377 |
| (561) 805-6721 |
| FAX (561) 653-2692 |