2003-03-21 00:00:00 | DENIED |
| REFERENCE: FBC-2001 PLUMBING |
| FBC-2001 FUEL GAS |
| FBC-2001 CHAPTER 11 |
| FBC-2001 FHA-98 DESIGN MANUAL |
| |
| 1) MOST OF THE FOLLOWING COMMENTS WERE |
| FROM THE PREVIOUS PLAN REVIEW AND WERE |
| NOT ADDRESSED. |
| 2) PLANS SHALL BE ROUTED TO THE PALM |
| BEACH HEALTH UNIT. |
| 3) GREASE TRAP SHALL BE SIZED BY UTILITY |
| DEPT. CONTACT R. COMPO (561) 837-4074. |
| 4) SHT A-2.31 SUBMIT CALCULATIONS FOR |
| PRIMARY AND SECONDARY ROOF DRAINS. IN- |
| CLUDE 1/2 AREA OF ALL VERTICAL WALLS, |
| AND AREA OF ROOFS DRAINING ON TO ROOF |
| FROM ABOVE. |
| 5) SUBMIT A HORIZONTAL STORM BLDG DRAIN. |
| SHOW ALL RISERS AS THEY TIE INTO STORM |
| DRAIN AS SHOW SQUARE FOOTAGE AS IT ACCU- |
| MULATES IN SYSTEM. |
| 6) SHTS A-2.41, A-2.42, & A-2.43, NO |
| MEASUREMENTS FOR BACKING SHOWN ON PLANS. |
| SPECIFICATION "A" OR "B" ARE NOT SHOWN |
| AS REQUIRED IN REQ. #7. W/C OPENING NOT |
| SHOWN AS REQUESTED. |
| 7) SHT A-8.11 TURNING CIRCLE NOT SHOWN |
| IN EACH TOILET ROOM AS REQUIRED. |
| 8) SHT A-8.13 ELEVATIONS 8B, 8C, & 8D DO |
| NOT MATCH INDICATOR ON DETAIL #1 SHT. |
| A-2.41 |
| 9) SHT P-102 WATER HEATER "A" DETAIL, |
| COMBUSTION AIR INTAKE SHALL BE SIZED AND |
| INSTALLED PER MANUF. INSTALL. INSTRUCTS. |
| PROVIDE INFORMATION FOR REVIEW. |
| 10) SHTS P-103 & P-404 WATER RISERS, |
| WATER HAMMER ARRESTORS SHALL BE LOCATED |
| NEAR THE FIXTURES IN AN EFFECTIVE RANGE, |
| NOT IN CEILING. PER PDI-WH 201 AND MANUF |
| INSTALL. INSTRUCTIONS. |
| 11) SHTS P-103, P-202, & P-404, VENTS |
| ARE REQUIRED FOR SHOWERS IN MENS & WO- |
| MENS LOCKER ROOMS. |
| 12) SHT P-201 SANITARY DRAINAGE PIPE |
| (BURIED) DOES NOT MATCH LEDGEND ON SHT |
| P-101. (ALSO SHT P-202) |
| 13) SHT P-202 CLEAN OUTS REQUIRED IN |
| SANITARY BLDG. DRAIN. MAX. 100'. |
| 14) SUBMIT A SANITARY BLDG DRAIN. SHOW |
| PIPE SIZES, CLEANOUTS, RISERS, AND SHOW |
| FIXTURE UNITS AS THEY ACCUMULATE IN THE |
| BLDG DRAIN. |
| 15) SHT P-202 ITEM P-145 FILTER TO BE |
| NSF APPROVED. PROVIDE MANUF. INFORMATION |
| 16) SHTS P-202/P-203, ITEMS P-125, AND |
| P-124, FUNNEL DRAINS NOT APPROVED. ALL |
| INDIRECT WASTE SHALL DRAIN INTO FLOOR |
| SINKS. SEC 802.3 |
| 17) SHT P-207 STACK B/19 NOT FOUND. |
| PLEASE CLAIRFY. ROOM C220 |
| 18) SHT P-207 STACK KS/9 IN MIDDLE OF |
| ROOM? NO WATER TO KITCHEN SINK. RM C220 |
| 19) SHTS P-216 & P-218, SIZE WATER MAINS |
| OVERHEAD IN CORRIDOR. |
| 20) SHT P-301 SHOW PIPE SIZES FOR RISER |
| "A". |
| 21) SHT P-401 SHOW PIPE SIZES FOR WATER |
| MAINS IN KITCHEN CEILING. |
| 22) SHT P-405 BTU LOAD OF GAS APPLIANCES |
| SHOWS 5,189,000 ON PLANS BUT ONLY ADDS |
| UP TO 4,266,000. PLEASE CLAIRFY. |
| 23) SUBMIT CALCULATIONS FOR COMBUSTION |
| AIR PER FBC-2001 FUEL GAS CODE SECTION |
| 304. SUBMIT MANUF. INFO. FOR COMBUSTION |
| AIR DIRECT VENT. |
| 24) SUBMIT MANUF. SHEET FOR ALL GAS |
| EQUIPMENT TO VERIFY COMPLIANCE WITH |
| STANDARDS NFPA 54, AND THE FBC-2001 FUEL |
| GAS CODE SEC 402.2 |
| 25) EMERGENCY HOOD SHUT DOWN SHUT OFF |
| VALVE TO BE BELOW CEILING. MANUAL SHUT |
| OFF VALVE TO BE UPSTREAM. UNION TO BE |
| DOWN STREAM OF MANUAL VALVE. |
| 26) SHT P-402 SANT. RISERS B/4, B/5, B/6 |
| B/8, B/9, & KS/2 - VENT SHALL NOT TIE |
| BACK INTO WASTE STACK AS SHOWN. |
| 27) SHTS P-402, & P-403 ALL VENT STACKS |
| SHALL BE WASHED AT THE BASE. START ALL |
| VENT STACKS FROM THE LOWEST FIXTURE |
| GROUP. |
| 28) SHT P-403 RISERS B/15, B/16, & B/18 |
| VENT SHALL NOT TIE BACK INTO WASTE STACK |
| AS SHOWN. |
| |
| WHEN RESUBMITTING PLANS |
| PLEASE CLEARLY INDICATE THE REVISION AND |
| REMOVE AND REPLACE ANY PAGES AS NECESS- |
| ARY. SUBMIT (1) SET OF OLD DRAWINGS WITH |
| THE PLANS WHEN RESUBMITTING PLANS. A |
| TRANSMITTAL LETTER LISTING THE ORIGINAL |
| REVIEW NUMBER, WITH A DESCRIPTION OF THE |
| REVISION MADE, IDENTIFYING THE SHEET OR |
| SPECIFICATION PAGE WHERE THE CHANGES CAN |
| BE FOUND, WILL HELP TO EXPEDITE YOUR |
| PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| |
| REVIEW BY KEN STEVENS |
| (561) 659-8096 EXT 8377 OR805-6721 |
| FAX 653-2692 |
| BUILDING PLAN REVIEW |