2002-07-03 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 CHAPTER 11
 FBC-2001 FUEL GAS
 FBC-2001 SECTION 424 POOLS
  
 1) PLANS SHALL BE ROUTED TO THE PALM
 BEACH HEALTH UNIT, DIVISION OF ENVIRON-
 MENTAL HEALTH, 901 EVERNIA WPB (561) 355
 3018 FOR KITCHEN AND POOL.
 2) GREASE TRAP SHALL BE SIZED BY UTILITY
 DEPT. PLEASE CONTACT RODNEY COMPO,
 ENVIRONMENTAL MANAGER, (561) 837-4074.
 3) PLEASE PROVIDE CALCULATIONS FOR MINI-
 MUM FACILITIES. USE TABEL 403.1.
 4) SHTS A-201B - A-2.21B TOILET STALLS
 SHALL HAVE A LAV. SEE FIG 30E IN CHAPTER
 11 FBC-2001.
 5) SHT A-2.31 PLEASE SUBMIT CALCULATIONS
 FOR PRIMARY AND SECONDARY ROOF DRAINS
 PER SECTIONS 1106 & 1107. INCLUDE 1/2
 AREA OF ALL VERTICAL WALLS AND AREA OF
 ROOFS DRAINING ON TO ROOF FROM ABOVE.
 SHOW LOCATION OF SECONDARY DRAINS.
 6) PLEASE SUBMIT A STORM RISER DIAGRAM.
 SHOW ALL RISERS WITH TOTAL SQ FT OF EACH
 RISER AND SHOW TOTAL SQ FT AS IT ACCUMU-
 LATES IN STORM DRAIN.
 7) SHTS A-2.41, A-2.42, & A-2.43 ALL
 RESIDENTIAL UNITS SHALL COMPLY WITH FHA-
 AMEND 98 DESIGN MANUAL. ALL REQUIREMENTS
 #'S 1 THRU 7 SHALL BE MET, AND SPECIFI-
 CATION "A" OR "B" SHALL BE INDICATED ON
 PLANS FOR BATHROOMS. PLEASE SHOW CLEAR
 FLOOR SPACE AND INDICATE OPENING SIZE
 FOR EACH WATER CLOSET.
 8) SHT A-8.11 DETAILS #1,2,3,4,5,6,7.
 PLEASE SHOW CLEAR FLOOR SPACE FOR ALL
 HDCP FIXTURES. SHOW TURNING RADIUS IN
 EACH TOILET ROOM. DOORS SHALL NOT SWING
 INTO THE CLEAR FLOOR SPACE OF ANY FIXT-
 URE OR THE UNOBSTRUCTED TURNING RADIUS
 FOR ANY FIXTURE.
 9) SHT A-8.12 DETAIL #3 SHOW CONTROL
 HEIGHT FOR SHOWER. 11-4.21.5
 10) SHT P-101 PLUMBING NOTES #2 CODE IN
 EFFECT IS FBC-2001 PLUMBING NOT SPC.
 PLEASE CHANGE REFERENCE.
 11) SHT P-101 PLUMBING NOTES #3B - PER
 MANUF. INSTRUCTIONS, AIR TESTS ON PVC
 PIPE AND FITTINGS ARE NOT APPROVED.
 PLEASE CHANGE NOTE.
 12) SHT P-101 PLUMBING NOTES #5 - AIR
 CHAMBERS ARE NOT APPROVED. PLEASE DE-
 LETE REFERENCE.
 13) SHT P-102 WATER HEATER "A" DETAIL,
 COMBUSTION AIR INTAKE SHALL BE SIZED AND
 INSTALLED PER MANUFACTURE INSTALLATION
 INSTRUCTIONS. PLEASE PROVIDE INFORMATION
 14) SHT P-102 GREASE TRAP DETAIL. TWO
 WAY CLEAN OUTS REQUIRED ON BOTH SIDES OF
 THE GREASE TRAP. SEE ATTACHED SHEET FOR
 WPB APPROVED GREASE TRAP DETAIL.
 15) SHT P-201 SANITARY DRAINAGE PIPE
 (BURIED) DOES NOT MATCH LEDGEND ON SHT
 P-101. PLEASE CLAIRFY. PLEASE SHOW DIFF-
 ERENCE BETWEEN BURIED PIPE & PIPE ABOVE
 CEILING. (ALSO ON SHT P-202)
 16) SHT P-202 THERE ARE UNVENTED WATER
 CLOSETS, CLEAN OUTS REQUIRED (MINIMUM
 100' BETWEEN CLEAN OUTS 708.3.1), UNVEN-
 TED FIXTURES, TWO SANT DRAIN LINES TO
 THE SAME WATER CLOSET.
 17) SHT P-202 ITEM P-145 FILTER TO BE
 NSF APPROVED. PROVIDE MANUF INFO.
 18) SHTS P-202/P-203 ITEMS P145B, P125,
 & P142 FUNNEL DRAINS NOT APPROVED. ALL
 INDIRECT WASTE SHALL DRAIN TO A FLOOR
 SINK. 802.3
 19) SHT P-205 STORM DRAIN NOT SIZED FOR
 LINE THAT EXITS AT -48" ELEVATION.
 20) SHTS P-207, P-210, P-211, P-212,
 P-213, P-214, P-215, P-216, P-217, AND
 P-218. VARIOUS UNITS SHOW WATER LINES
 RUNNING TO RANGE/OVEN AND NOT TO KITCHEN
 SINK. SOME UNITS SHOW NO WATER TO KIT.
 SINKS. SOME UNITS SHOW WATER IN WALL
 ON THE OTHER SIDE OF ROOM FROM THE FIX-
 TURES IN BATHROOMS. PLEASE CHECK UNITS
 FOR THESE DISCREPANCIES.
 21) SHTS P-212, P-216, & P-217 PLEASE
 SHOW SIZE FOR WATER PIPES RUNNING IN
 CEILING ABOVE CORRIDOR.
 22) SHT P-301 BATHROOM PLAN, PLEASE SHOW
 CLEAR FLOOR SPACE FOR FIXTURES.
 23) SHTS P-302, & P-401, ALL INDIRECT
 WASTE SHALL DRAIN INTO A FLOOR SINK.
 FUNNEL FLOOR DRAINS NOT APPROVED. 802.3
 24) SHTS P-302 & P-401 DISH WASH MACHINE
 SHALL DRAIN TO SANITARY NOT GREASE WASTE
 UTILITY ORD.
 25) SHT P-401 DOMESTIC WATER RISER DIAG.
 WATER HAMMER ARRESTORS SHALL BE LOCATED
 NEAR FIXTURE IN AN "EFFECTIVE RANGE" NOT
 AT TOP OF DROP AS SHOWN. WH-PDI 201 &
 MANUFACTURE INSTALL. INSTRUCTIONS. ALSO
 SHOW PIPE SIZES FOR KITCHEN MAINS.
 26) SEPARATE PERMIT REQUIRED FOR GAS.
 SEE INFORMATION REQUIRED FOR GAS PERMIT
 APPLICATION BELOW.
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2001
 FUEL GAS CODE.
 B. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
 C. TYPE OF GAS, (LP OR NATURAL)
 D. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 FBC-2001 FUEL GAS CODE SECS.401.8 THRU
 402.5.2 & TABLES 402(1) THRU 402(34).
 E. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2001 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES (A)(3).
 F. SUBMIT CALCULATIONS FOR COMBUSTION
 AIR (IF APPLICABLE) PER FBC-2001 FUEL
 GAS CODE. SEC 304. PLEASE SUBMIT MANUF.
 INFORMATION FOR COMBUSTION AIR DIRECT
 VENT.
 G. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2001 FUEL GAS SEC. 402.2. IF
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
 H. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE FBC-
 2001 FUEL GAS CODE SEDC 402.2.
 I. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
 J. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND
 APPURTENANCES PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
 K. EMERGENCY HOOD SHUT DOWN SHUT OFF
 VALVE TO BE BELOW CEILING. MANUAL SHUT
 OFF VALVE TO BE UPSTREAM. UNION TO BE
 DOWN STREAM OF MANUAL VALVE.
 27) SUPPLY A SANITARY RISER DIAGRAM FOR
 THE BLDG DRAIN. SHOW ALL RISER CONNECT-
 IONS WITH FIXTURE UNIT LOAD FOR EACH
 RISER AND SHOW FIXTURE UNITS AS THEY
 ACCUMULATE IN THE SYSTEM TO VERIFY PIPE
 SIZE OF BLDG DRAIN. SHOW HOW ALL VENT
 LINES TIE INTO BLDG DRAIN.
 28) P-402 RISERS B/4, B/5, B/6, B/9, &
 KS/2 VENT SHALL NOT TIE BACK INTO WASTE
 AS SHOWN.
 29) SHTS P-402 & P-403 ALL VENT STACKS
 SHALL BE WASHED AT THE BASE. START ALL
 VENT STACKS FROM THE LOWEST FIXTURE
 GROUP.
 30) SHT P-403 RISER B/16 2N FLOOR T-2
 NOT VENTED.
 31) SHT P-403 RISER B/15 W/C FOR 2ND
 FLOOR NOT VENTED.
 32) SHT P-403 RISERS B/15, B/16, B/18
 VENTS SHALL NO TIE BACK INTO WASTE STACK
 AS SHOWN.
  
 REVIEW BY KEN STEVENS