Plan Review Notes
Plan Review Notes For Permit 02060379
Permit Number 02060379
Review Stop P
Sequence Number 1
Notes
Date Text
2002-07-05 00:00:00DENIED
 REFERENCE: FBC-2001 CHAPTER 11
 FBC-2001 PLUMBING
 FHA AMEND-98 DESIGN MANUAL
  
 1) ROUTE PLANS TO PALM BEACH COUNTY
 HEALTH UNIT, DIVISION OF ENVIRONMENTAL
 HEALTH, 901 EVERNIA ST WPB 33401. (561)
 355 3018 BEFORE RESUBMITTING FOR PLAN
 REVIEW.
 2) SHT A-201 SHOW CLEAR FLOOR SPACE FOR
 ALL HDCP FIXTURES IN TOILET, SHOWER,
 BATHROOMS IN DWELLINGS, AND FOR DRINKING
 FOUNTAINS.
 3) SHT A-2.31 PLEASE PROVIDE CALCULAT-
 IONS FOR PRIMARY AND SECONDARY ROOF
 DRAINS PER SECTIONS 1106 & 1107. ADD 1/2
 AREA OF ALL VERTICAL WALLS AND ALL ROOF
 AREA THAT IS DRAINING FROM ABOVE. SHOW
 SIZE FOR ALL SCUPPERS.
 4) SHT A-8.03 SHOW CONTROL HEIGHT ON
 SHOWER DETAIL. 11-4.21.5
 5) SHT A-8.05 TOILET ROOM DETAILS NUMB-
 ERS 1, 2, 3, 4, 5, 6, & 7, DOORS SHALL
 NOT SWING INTO CLEAR FLOOR SPACE OR UN-
 OBSTRUCTED TURNING RADIUS OF ANY FIXTURE
 WATER CLOSET SHALL BE 1'6" OFF WALL TO
 CENTER OF FIXTURE. WATER CLOSED SHALL
 NOT INTRUDE INTO 5' TURNING RADIUS.
 PLEASE SHOW ON DETAILS.
 6) SHT P-101 DETAIL 3/P-001 WATER HEATER
 "A" DETAIL. WATER HEATER PIPING SHOULD
 BE CONFIGURED TO FEED AND DRAIN FROM
 EACH WATER SIMULTANIOUSLY. THEY SHOULD
 BE PIPED IN PARALLEL NOT IN SERIES AS
 SHOWN. SEE MANUFACTURE INSTALLATION IN-
 FORMATION. (HEATERS SHOULD BE COMPANION,
 NOT SLAVE HEATERS)(SEE SHT P-102)
 7) SHT P-101 DETAIL 3/P-001 WATER HEATER
 "A" DETAIL, BOTTOM FED WATER HEATERS
 SHALL HAVE A VACUUM RELIEF VALVE INSTALL
 ED.
 8) SHT P-101 DETAIL 3/P-001 WATER HEATER
 "A" DETAIL, A MEANS OF CONTROLLING THERM
 AL EXPANSION IS REQUIRED. SEC 607.3.2.
 9) SECOND SHT P-101 SANITARY FLAT DRAW-
 ING, CLEAN OUTS SHALL BE LOCATED MAXIMUM
 100', MORE ARE REQUIRED.
 10) SECOND SHT P-101 WATER LINES FLAT
 DRAWING, DOUBLE VALVES TO WATER LINES
 FEEDING JANITOR CLOSET (D110) AND SHOW-
 ER ROOM (D112). NO VALVES TO KITCHEN
 WATER (D201)
 11) SHT P-102 BACKFLOW REQUIRED FOR
 WATER LINE TO FOUNTAIN.
 12) SHT P-102 SANITARY RISER, BLDG DRAIN
 MAXIMUM 100' FOR CLEANOUTS. MORE REQUIR-
 ED. SHOW ON RISERS.
 13) SHT P-105 WATER RISER DIAGRAM, WATER
 HAMMER ARRESTORS REQUIRED FOR ALL QUICK
 CLOSING VALVES, (DISHWASHERS, WASH MACHI
 NES, AND ICE MAKERS), AND SHALL BE LOCA-
 TED NEAR THE FIXTURE IN AN "EFFECTIVE
 RANGE" NOT AT TOP OF DROP. PLEASE SHOW
 ON WATER RISER. SEC 604.9
 14) PLEASE PROVIED A SANITARY RISER DIA-
 GRAM FOR BLDG DRAIN. SHOW TOTAL FIXTURE
 UNITS AS THEY ACCUMULATE IN SYSTEM.
 15) PLEASE PROVIDE A STORM RISER DIAGRAM
 WITH ALL SQ FT AND SHOW AS IT ACCUMULAT-
 ES IN SYSTEM.
 16) PLEASE PROVIDE CONDENSATE RISER
 DIAGRAM. PROVIDE DETAILS FOR CONDENSATE
 EXITING BLDG. RELIEF VENTS REQUIRED. SHT
 5 CIVIL SHOWS ROOF DRAIN TIE IN FOR COND
 PLEASE CHANGE TO SHOW CONDENSATE TIE IN.
 17) ALL DWELLING UNITS SHALL COMPLY WITH
 FHA AMEND-98 DESIGN MANUAL. PLEASE SHOW
 COMPLIANCE WITH REQUIREMENTS 1 THRU 7
 AND SPECIFY SPECIFICATION "A" OR "B" FOR
 BATHROOMS. SEE DESIGN MANUAL FOR TYPICAL
 A OR B BATHROOM LAYOUTS.
 18) SHT P-102 FOUNTAIN. PLEASE SHOW
 RISER FOR FOUNTAIN. FOUNTAIN DRAIN SHALL
 DRAIN TO SANITARY, AND OVERFLOW SHALL
 DRAIN TO STORM. PLEASE PROVIDE DETAILS.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved