2003-01-27 00:00:00 | CHECKLIST FOR PROVISO SUBMITTAL: |
| 1-ENGINEERING CALCULATIONS SHOW THAT |
| WOOD COLUMNS (P1) ARE NOT STRUCTURALLY |
| ADEQUATE. SHEET S-1 SHOWS WOOD COLUMN |
| P1 AT DEN AREA. CLARIFY AND REVISE AS |
| REQUIRED AND PROVIDE CERTIFICATION |
| THAT STEEL COLUMN WAS INSTALLED. |
| SEC. 104.2.1.2 CITY AMENDMENTS TO FBC. |
| 2-PROVIDE SOIL TEST REPORT. THERE'S NONE |
| SUBMITTED FOR THE CITY FILES. |
| 3-STORM SHUTTERS: A)PROVIDE COMPLETE |
| SBCCI PRODUCT APPROVAL REPORT #2229. |
| B)CLEARLY MARK ON DRAWINGS SPECIFIC |
| MOUNTING CONDITIONS AND ANCHOR TYPE & |
| SPACING TO BE USED ACCORDING TO THE |
| MEAN ROOF HEIGHT, DESIGN PRESSURES, |
| EDGE DISTANCE, PANEL SPAN, CONNECTION |
| TYPE AND STRUCTURE TO BE ATTACHED TO. |
| C)CHECK DESIGN PRESSURES SPECIFIED ON |
| PLANS AND THOSE SPECIFIED ON INSTALLA- |
| TION SCHEDULE. |
| D)PROVIDE INSTALLATION SCHEDULE AND KEY |
| PLAN THAT MATCH ACTUAL PLANS SUBMITTED |
| |
| 4-SINGLE HUNG WINDOWS PRODUCT APPROVAL |
| IS EXPIRED. |
| 5-ENTRY DOOR PRODUCT APPROVAL NEED FRONT |
| PAGE TO HAVE DADE COUNTY LOGO AND THE |
| DRAWINGS STAMPED WITH THE RENEWAL # AS |
| REQUIRED BY DADE COUNTY. |