2002-08-12 00:00:00 | CHECKLIST: |
| 1-PROVIDE ENGINEERING ANALYSIS & CALCS. |
| CLARIFY HOW ARE WIND WINDLOADS BEING |
| CONTINUOUSLY TRANSFERED TO THE FLOOR |
| & CEILING DIAPHRAGMS. SEE SECTIONS |
| 1606.2.4, 2105 AND 2107 FBC 2001. |
| 2-NEED RECORDED NOTICE OF COMMENCEMENT. |
| 3-SEE COMMENTS ON PLANS. PLEASE RETURN |
| REVIEWED SET AFTER CORRECTIONS ARE |
| DONE TO EXPEDITE REVIEW PROCESS. |
| 4-SPECIFY FIRE CUTS ON STRUCTURAL DETAIL |
| SECTIONS ALSO. SEC. 2105.1.4 FBC 2001. |
| 5-PROVIDE SOIL TEST REPORT. |
| 6-PROVIDE COMPLETE INFORMATION FOR STORM |
| SHUTTERS. KEY PLAN AND COMPLETE INSTA- |
| LLATION SCHEDULE. PRODUCT APPROVAL W/ |
| MATCHING LEGIBLE DRAWINGS. |
| 7-PROVIDE PRODUCT APPROVAL FOR: |
| A)ENTRY DOOR WITH LEGIBLE DRAWINGS. |
| B)ARCHED WINDOWS WITH DWGS THAT MATCH |
| THE PRODUCT APPROVAL. |
| C)GLASS BLOCK COMPLETE UL SPECIFICATIONS |
| FOR ONE HR FIRE RATED ASSEMBLY. |
| 8-REVISE DETAIL FOR 2X STRUCTURAL BUCK |
| REQUIRED BY THE PRODUCT APPROVAL. SEE |
| DETAIL SUBMITTED AND DETAIL FOR FRAM'G |
| AT ARCHED OPENINGS. THEY DON'T MATCH. |
| 9-SPECIFY FIREBLOCKING SIZE AND LOCATION |
| AT STAIRS, INCLUDING AT TOP OF STAIRS. |
| SEC. 2105.1.4 FBC 2001. |
| 10-REVISE CONNECTORS SPECIFIED AT TOP |
| OF FRAMING WALLS. NEED WOOD TO WOOD |
| CONNECTOR. CONNECTOR SPECIFIED IS TO |
| BE EMBEDED IN CONCRETE. |
| 11-PROVIDE COMPLETE DETAILS AND SPECS |
| FOR CONSTRUCTION AND INSTALLATION OF |
| WOOD FRAMED SHEAR WALL. SEE SECTION |
| 2313 FBC 2001. |