2002-06-20 00:00:00 | CHECKLIST: |
| 1-NEED RECORDED NOTICE OF COMMENCEMENT. |
| 2-REVISE SIZE OF ATTIC ACCESS. NOTE #14. |
| 36" MIN.(NOT 30"). SEC. 2309.6 FBC. |
| 3-CLARIFY SIZE OF EGRESS WINDOWS. 24SH & |
| 34SH DON'T PROVIDE 24" MIN. CLEAR HT. |
| ALSO, 24SH DON'T PROVIDE THE 5.7 S.F. |
| MIN. CLEAR OPENING. SEC 1005.4.4 FBC |
| 4-SEE COMMENTS ON PLANS. PLEASE RETURN |
| REVIEWED SET TO EXPEDITE REVIEW. |
| 5-SPECIFY FIRECUTS AT MASONRY WALL AS |
| REQUIRED BY SEC. 2305.4 FBC 2001. |
| 6-PROVIDE SPECIFICATIONS FOR SOIL AND |
| FOOTING PROTECTION WHEN IMPACTED BY |
| WATER FROM VALLEYS. SEC. 1804.1.6 FBC. |
| 7-PROVIDE SOIL TEST REPORT. |
| 8-DESIGN JOINTS AT CONCRETE SLAB. SEC. |
| 1909.3 FBC. (OR SPECIFY WWM SUPPORTS. |
| SEE SEC. 1909.3 FBC 2001). |
| 9-STORM SHUTTERS: |
| A)PROVIDE COMPLETE INSTALLATION SCHEDULE |
| AND KEY PLAN. |
| B)CLEARLY INDICATE ON DRAWINGS SPECIFIC |
| MOUNTING CONDITIONS & ANCHOR TYPE & |
| SPACING TO BE USED ACCORDING TO THE |
| MEAN ROOF HEIGHT, DESIGN PRESSURES, |
| EDGE DISTANCE, PANEL SPAN, CONNECTION |
| TYPE AND STRUCTURE TO BE ATTACHED TO. |
| 10-PROVIDE PRODUCT APPROVAL FOR: |
| A)SINGLE ENTRY DOOR AS SHOWN ON PLANS. |
| B)COMPLETE DADE COUNTY PRODUCT APPROVAL |
| FOR PAN AMERICAN WINDOW MULLIONS SINCE |
| WINDOWS USED ARE PANAMERICAN NO LAWSON |
| C)ARCHED WINDOWS NEED LEGIBLE DRAWINGS. |
| 11-PROVIDE UPDATE ORIGINAL LETTER OF |
| MASONRY TO BE USED. LETTER TO BE |
| ADDRESSED TO CITY OF WPB CLEARLY |
| IDENTIFYING PROJECT AND CONTRACTOR. |
| 12-PROVIDE 2X STRUCTURAL BUCK DETAIL AS |
| REQ'D BY PRODUCT APPROVAL SUBMITTED |
| FOR ARCHED WINDOWS. |
| 13-AREA CALCULATIONS DON'T MATCH. SEE |
| SHEET C-1 AND A-1. REVISE AS REQUIRED. |
| 14-BRING BACK DWGS TO PALM BEACH COUNTY |
| TO HAVE A/C AREAS REVISED AS REQUIRED. |
| 15-NEED A COMPLETE BATHRM @ 1ST FL. WITH |
| DOOR WITH 29" MIN. CLEAR OPEN'G. |
| MASTER BATHRM WATER CL. DOOR DOESN'T |
| PROVIDE IT. (NOTE: POWDER RM DOESN'T |
| COUNT AS BATHRM) SEC 11-11 FBC 2001. |
| 16-PROVIDE COMPLETE DETAILS & UL SPECS |
| FOR 1HR FIRE RATED GLASS BLOCK |
| ASSEMBLY AT ZERO LOT LINE WALL. AS |
| REQ'D BY TABLE 600 FBC 2001. |
| 17-TRUSS ANCHOR SCHEDULE & ROOF FRAMING |
| PLAN DON'T MATCH REVISE & CLARIFY. |
| 18-WHERE IS THE ROOF SHEATHING NAILING |
| SCHEDULE? NO SHOWN ON PLANS. |
| 19-GABLE END DETAIL IS MISSING SOME |
| CONNECTORS. ALSO, VERIFY THAT GABLE |
| END IS STRUCTURAL CONTINUOUS AS REQ'D |
| BY SECTION 2313.4 FBC 2001. |
| 20-REVISE ENERGY CALCULATIONS TO MATCH |
| A/C AREAS THAT MATCH THIS HOUSE. SEE |
| SHEET A-1. |