Plan Review Notes
Plan Review Notes For Permit 02051528
Permit Number 02051528
Review Stop R
Sequence Number 1
Notes
Date Text
2002-06-19 00:00:00************BUILDING PROVISO************
  
 1) PROVIDE (2) COPIES OF UPDATED SOIL
 REPORTS WHICH REFERENCE THE 2001 FLORIDA
 BUILDING CODE.
  
 2) THE WELDED WIRE MESH IN THE CONCRETE
 PAD IS REQUIRED TO BE SUPPORTED PER FBC
 SEC. 1909.3.
  
 3) THE WINDOW IN BATHROOM #2 WHICH IS
 WITHIN 3 FEET OF THE TUB IS REQUIRED TO
 BE SAFETY GLAZING PER FBC SEC. 2405.2(2)
  
 4) THE GLASS BLOCK IN AT THE MASTER BATH
 TUB IS REQUIRED TO HAVE A MINIMUM
 UNIFORM FACE THICKNESS OF .25".
  
 NOTE: PLEASE INDICATE THE ABOVE
 INFORMATION ON THE PLANS FOR FUTURE
 SUBMITTALS.
  
 5)PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - WINDOWS (#2 & #4) ARCHED TOP FIXED
 GLASS WINDOWS
 - GLASS BLOCK
  
 NOTE: TRUSS DRAWINGS ARE NO LONGER
 REQUIRED TO BE SUBMITTED FOR PLAN REVIEW
 THEY WILL BE REQUIRED TO BE ON THE JOB
 SITE AT TRUSS INSPECTION. A SIGNED AND
 SEALED SET FOR PUBLIC RECORD IS REQUIRED