Plan Review Notes
Plan Review Notes For Permit 02050736
Permit Number 02050736
Review Stop B
Sequence Number 2
Notes
Date Text
2002-07-29 00:00:00A RESIDENTIAL FIRE SPRINKLER SYSTEM,
 (13R), IS NOT A RECOGNIZED ALTERNATE
 FOR OTHER CODE REQUIREMENTS.SEE FBC
 903.2 AND FBC 903.7.5.
  
 THE STAIRS FROM THE SECOND FLOOR IN
 BLDGA ARE REQUIRED TO BE ENCLOSED IN
 FIRE RATED CONSTRUCTION AND TO PROVIDE
 A CONTINUOUS PROTECTED PATH TO THE
 OUTSIDE.SEE FBC 1006.1 AND FBC
 1010.1.1.
  
 THE FIRE PROTECTION DESIGN IS REQUIRED
 TO APPEAR ON THE PERMIT PLANS.SEE FBC
 104.1. (SPRINKLER & ALARM)
  
 IF TEST NOTICE OF ACCEPTANCE REPORTS ARE
 NOT INCLUDED WITH THE PERMIT PLANS FOR
 THE NEW AND OR RELOCATED DOORS AND
 WINDOWS, A SEPARATE PERMIT AND FEES FOR
 THAT WORK WILL BE REQUIRED.SEE
 ATTACHED "IMPLEMENTATION STANDARD"ALSO
 SHOW HOW HURRICANE MISSILE IMPACT
 RESISTANCE WILL BE ACCOMPLISHED.
  
 SHOW THE COMPONENT AND CLADDING DESIGN
 PRESSURES FOR THE OPENINGS.
  
 THE RG THOMAS LETTER DATED JULY 8, 2002,
 IN ITEM #3 DECLARES THAT THE SOUTH
 BUILDING WOULD NOT HAVE PUBLIC AREAS
 AND THEREFORE NEED NOT BE ACCESSIBLE.
 THE PLANS SHOW THREE BEDROOM SUITES AND
 A MANAGER'S APARTMENT.WILL THE SUITES
 NOT BE AVAILABLE TO THE PUBLIC?
  
 PROVIDE DETAILS FOR THE FISH POND SHOWN
 ON SHEET SP 1.
  
 SHOW THE FIRE RATED TENANT SEPARATION
 FOR THE SUITES IN ACCORDANCE WITH FBC
 704.3.
  
 PROVIDE A CONSTRUCTION DETAIL FOR THE
 EXISTING PATIO TO BE ENCLOSED AT THE
 REAR OF BUILDING A, AND FOR THE FRONT
 PORCH AS WELL.
  
 AN 8.5 X 11 SHEET INCLUDED WITH THE
 PERMIT SUBMITTAL SHOWS TWO PARKING
 SPACES OFF THE ALLEY AT THE REAR OF
 BUILDING A.SHOW THE REQUIRED HC SPACE
 ON AN ACCESSIBLE ROUTE.
  
 SHOW THE SIGNAGE FOR THE HC ACCESSIBLE
 ENTRANCE WHICH WILL NOT BE AT THE MAIN
 PUBLIC ENTRANCE. SEE FBC 11-4.1.2 (7).
  
 SHEET A1, DECLARE THE INTENDED OCCUPANCY
 USE OF THE ROOMS ON THE FIRST FLOOR OF
 BLDG A SHOWN ON THE EAST AND WEST SIDES,
 AND ON THE SECOND FLOOR, THE ROOM IN
 THE SOUTH WEST CORNER.
  
 SHEET A2, BLDG B.WHAT WILL BE THE USE
 OF THE SECOND FLOOR?HOW WILL EGRESS
 AND ACCESS BE ACCOMPLISHED SUBSEQUENT
 TO THE DEMOLILTION OF THE STAIRS?SEE
 FBC 104.2.
  
 SHEET A2, WHERE ARE THE TOILET
 FACILITIES FOR BEDROOM SUITE #3?SEE
 FBC 1204.
  
 SHEET A2, THE NEW DOOR AT THE FRONT OF
 THE BUILDING IS NOT PERMITTED TO OPEN
 DIRECTLY ONTO A FLIGHT OF STAIRS.SEE
 FBC 1012.1.4.
  
 WHAT IS THE CONDITION OF THE DOOR SHOWN
 AS EXISTING FROM THE MANAGER'S ROOM,
 GIVEN THAT STAIRS ARE INDICATED ON THE
 FRONT AND REAR OF THE BUILDING?
  
 WHAT WILL THE PORCH INTENDED TO BE
 ENCLOSED BE USED FOR?
  
 SHEET SP1, WHAT DO THE CROSS HATCHED
 AREAS SHOWN EXTERIOR TO BOTH BUILDINGS
 INDICATE?
  
 SHEET A3, SECTION 1A3. A GUARDRAIL AS
 WELL AS HANDRAILS ARE REQUIRED FOR THE
 DECK.WHAT IS THE RISE AND RUN OF THE
 STAIRS?CONSTRUCTION DETAIL?
  
 AS PREVIOUSLY NOTED IMPACT FEES MUST BE
 PAID TO THE COUNTY BEFORE A PERMIT MAY
 BE ISSUED.