2002-06-06 00:00:00PROVISOS:
  
 SHEET SP1.IF THE DRIVEWAY IS INTENDED
 TO BE CONSTRUCTED UNDER THIS PERMIT,
 CONSTRUCTION DETAILS AND SPECIFICATIONS
 ARE NECESSARY.ALTERNATIVELY A
 SEPARATE PERMIT, FEES AND THE REQUISITE
 INFORMATION WILL BE REQUIRED.
  
 BATHROOMS #2, #3 AND #4 REQUIRE SAFETY
 GLAZING.SEE FBC 2405.1.
  
 IF THE METHOD OF HURRICANE MISSILE
 IMPACT RESISTANCE FOR THE GLAZED AREAS
 IN THE EXTERIOR BUILDING ENVELOPE IS
 NOT INCLUDED WITH THIS PERMIT
 APPLICATION, A SEPARATE PERMIT AND FEES
 ARE REQUIRED.
  
 MIAMI-DADE NOA 01-0317.26 "PREMDOOR
 ENTRY SYSTEMS" IS MISSING THE DRAWING
 STIPULATED IN THAT REPORT.
  
 THE NORANDEX PRODUCT SPECIFICATION CITES
 THE 1997 STANDARD BUILDING CODE, IS NOT
 SIGNED AND SEALED, AND DOES NOT HAVE
 THE SPECIFIC SIZES SELECTED.
  
 THE CLOPAY GARAGE DOOR SBCCI 9606 TEST
 REPORT IS NO LONGER VALID.SEE REPORT
 #9606C AND SELECT THE APPROPRIATE DOORS
 TO BE USED.
  
 SHEET T1 MASONRY NOTES DECLARES THAT THE
 WALLS ARE DESIGNED TO THE ASCE5/ACI
 530STANDARD, YET THE INFORMATION IN ACI
 5301.2.1 THAT IS DIRECTED TO APPEAR ON
 THE PROJECT DRAWINGS IS MISSING.
 THINGS LIKE F'M, GROUT TEST REQ. AND
 OTHERS.
  
 BEFORE A PERMIT TO CONSTRUCT MAY BE
 ISSUED, IMPACT FEES MUST BE PAID TO THE
 COUNTY, THE PERMIT PLANS STAMPED BY
 THAT OFFICE AND A COPY OF THE PAID
 RECEIPT ATTACHED TO THE PERMIT
 APPLICATION.CALL 561
 -233-5025 FOR MORE INFORMATION.