Plan Review Notes
Plan Review Notes For Permit 02041425
Permit Number 02041425
Review Stop B
Sequence Number 4
Notes
Date Text
2002-07-23 00:00:00MANUFACTURED BUILDINGS:
 DEPARTMENT OF COMMUNITY AFFAIRS
 DIRECTOR: MO MADANI
 IN CONVERSATION MR. MADANI REVIEWED THE
 INFORMATION SUBMITTED BY CITY OF WPB
 FOR MANUFACTURED BUILDINGS.
 RULING: MANUFACTURED BUILDINGS ORIGIN-
 ALLY BUILT BEFORE MARCH 1, 2002 SHALL
 BE INSTALLED UNDER THE WIND SPEEDS OF
 THE 1997 SBC. THE NEW FOUNDATION SHALL
 BE DESIGNED TO THE 2001 FL BLDG CODE.
 GLAZED OPENINGS, UNDER THE 1997 SBC,
 THE CONTRACTOR IF SO CHOOSE, 7/16TH INCH
 PLYWOOD MAY BE USED INSTEAD OF METAL
 STORM PANELS. BOTH ARE SUBMITTED AS PART
 OF THIS PACKAGE.
 BUILDING PLAN REVIEW
 JIM WITMER